Difference between revisions of "Clinical Trials Registration and Results"
Line 83: | Line 83: | ||
* [http://wiki.hl7.org/images/8/8f/HL7_v3_Reference_Models_March_2008_-_Part_2.zip HL7 v3 Reference Models Introduction - Part 2] | * [http://wiki.hl7.org/images/8/8f/HL7_v3_Reference_Models_March_2008_-_Part_2.zip HL7 v3 Reference Models Introduction - Part 2] | ||
+ | |||
+ | * Here is a [http://blogs.sun.com/vishblogs/entry/understanding_hl7_v3_from_developer link] to an article that explains the HL7 message development process and the artifact naming convention. | ||
+ | |||
. | . |
Revision as of 17:20, 22 April 2010
Return to RCRIM main page
Clinical Trials Registration and Results - WIKI page
The intent of this page is to have a repository of documents or artifacts associated with the Clinical Trials Registration and Results project.
Contents
Project Scope
This document was amended and approved by RCRIM on November 25, 2008
CTR&R Project Scope - From project Insight
CTR&R Project Scope - MSWord File
Approved Project Charter on January 21, 2009:
Presentation from the December 10, 2008 - Public Meeting:
.
Project Leads
If you have any issues or concerns, please contact one of the following:
Scott Getzin (Lilly) – sgetzin@lilly.com
Ed Helton (NCI) – heltone2@mail.nih.gov
Tracy Beck (Lilly) - becktj@lilly.com
Kristofer Spahr (Merck) - kristofer_spahr@merck.com
.
Project Meeting Minutes
Project Working Documents
Project Team Participation
- Telecom: 770-657-9270 . Passcode: 745896
- ATT Webcast: https://www.webmeeting.att.com . Meeting#: 5114686455 . CODE: 307694
- Goto Meeting: https://www2.gotomeeting.com/join/567159050
.
HL7 CTRR Ballot Materials - May 2010
- The XSD, HDM, JPG and VSD files are contained in the attached zip file
- Additional HL7 Core Schemas required for the above CTRR schema zip file
- CTRR Data Requirements to BRIDG Model Element Mapping . (Requires Excel 2007)
.
HL7 Voting Introduction
or
- HL7 Voting Background - Part 1
- HL7 Voting Ballot Desktop - Part 2
- HL7 Voting Understanding the Ballot Materials - Part 3
- HL7 Voting Casting Ballot - Part 4
.
Other HL7 Educational Materials
- Here is a link to an article that explains the HL7 message development process and the artifact naming convention.
.
Overall Project Timeline (subject to change)
May 2009 – Message Development
- Complete Storyboards, Interaction and Activity Diagrams, Trigger Events, etc...
- Develop CTRR HL7 Models based on existing artifacts
January 2010 – Ballot
- DSTU Ballot - Draft Standard for Trial Use (providing all ballot materials including the model)
May 2010 – Ballot
- DSTU Ballot - Draft Standard for Trial Use (including EMEA requirements)
June 2010 - Begin Testing (likely period - 6 to 12 months)
- Develop Implementation Guide based on Testing
January 2011 – Ballot
- Normative Ballot (providing all ballot materials including the implementation guide)
February 2011 - Begin Implementation and Production Use!!