This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Clinical Trials Registration and Results"

From HL7Wiki
Jump to navigation Jump to search
Line 55: Line 55:
 
==HL7 CTRR Ballot Materials - May 2010==
 
==HL7 CTRR Ballot Materials - May 2010==
 
*  The XSD, HDM, JPG and VSD files are contained in the attached [http://wiki.hl7.org/images/b/ba/CTRR_-_Schema_-_PORT_MT140001UV.zip zip file]
 
*  The XSD, HDM, JPG and VSD files are contained in the attached [http://wiki.hl7.org/images/b/ba/CTRR_-_Schema_-_PORT_MT140001UV.zip zip file]
 +
 +
*  Additional HL7 Core Schemas required for the above CTRR schema [http://wiki.hl7.org/images/9/9a/HL7_Addl_core_schemas.zip zip file]
  
 
*  [http://wiki.hl7.org/images/e/ea/CTRR_Domain_Analysis_Model.zip CTRR Domain Analysis Model]
 
*  [http://wiki.hl7.org/images/e/ea/CTRR_Domain_Analysis_Model.zip CTRR Domain Analysis Model]

Revision as of 17:13, 22 April 2010

Return to RCRIM main page

Clinical Trials Registration and Results - WIKI page

The intent of this page is to have a repository of documents or artifacts associated with the Clinical Trials Registration and Results project.

Project Scope

This document was amended and approved by RCRIM on November 25, 2008

CTR&R Project Scope - From project Insight

CTR&R Project Scope - MSWord File

Approved Project Charter on January 21, 2009:

Project Charter Version 1.0

Presentation from the December 10, 2008 - Public Meeting:

Public Meeting Presentation

.

Project Leads

If you have any issues or concerns, please contact one of the following:

Scott Getzin (Lilly) – sgetzin@lilly.com

Ed Helton (NCI) – heltone2@mail.nih.gov

Tracy Beck (Lilly) - becktj@lilly.com

Kristofer Spahr (Merck) - kristofer_spahr@merck.com

.

Project Meeting Minutes

CTRR Meeting Minutes


Project Working Documents

CTRR Working Documents


Project Team Participation

How to Get Connected


.

HL7 CTRR Ballot Materials - May 2010

  • The XSD, HDM, JPG and VSD files are contained in the attached zip file
  • Additional HL7 Core Schemas required for the above CTRR schema zip file

.

HL7 Voting Introduction

or

.

Other HL7 Educational Materials

.

Overall Project Timeline (subject to change)

May 2009 – Message Development

  • Complete Storyboards, Interaction and Activity Diagrams, Trigger Events, etc...
  • Develop CTRR HL7 Models based on existing artifacts


January 2010 – Ballot

  • DSTU Ballot - Draft Standard for Trial Use (providing all ballot materials including the model)


May 2010 – Ballot

  • DSTU Ballot - Draft Standard for Trial Use (including EMEA requirements)


June 2010 - Begin Testing (likely period - 6 to 12 months)

  • Develop Implementation Guide based on Testing


January 2011 – Ballot

  • Normative Ballot (providing all ballot materials including the implementation guide)


February 2011 - Begin Implementation and Production Use!!