This wiki has undergone a migration to Confluence found Here
Difference between revisions of "Negation Requirements Project Minutes 6 June 2018"
Jump to navigation
Jump to search
Line 105: | Line 105: | ||
# Outline draft | # Outline draft | ||
− | ## problem statement (firm). Include both general causes and specific needs. | + | ## problem statement (firm). Include both general causes and specific needs. [[Media: NegationDocument18.docx | Section 1 draft]] |
## approach (firm). Use of example requirements and example transforms to identify guidance | ## approach (firm). Use of example requirements and example transforms to identify guidance | ||
## requirement classification (things to represent, circumstances in which we need to distinguish absence in these representations) | ## requirement classification (things to represent, circumstances in which we need to distinguish absence in these representations) | ||
## guidance | ## guidance | ||
## catalog of transform examples | ## catalog of transform examples | ||
− | |||
# Schedule draft | # Schedule draft | ||
## 23-May choose meeting times | ## 23-May choose meeting times |
Revision as of 21:23, 5 June 2018
Back to Negation Minutes
Minutes
Meeting Information
HL7 PC-CIMI-POC Meeting Minutes Location: PC call line |
Date: 2018-06-06 Time: 4:00-5:00 PM ET | ||
Facilitator | Jay Lyle | Note taker(s) | Jay Lyle |
Attendee | Name | Affiliation
| |
Jay Lyle | JP Systems | ||
Abrar Salam | Joint Commission | ||
Ron Shapiro | Qvera | ||
Matt Lord | |||
Gay Dolin | IMO | ||
Linda Michaelsen | Optum | ||
George Dixon | |||
Lisa Nelson | |||
Agenda
Agenda Topics
- Review outline draft
- Review schedule draft
Minutes
- Outline draft
- problem statement (firm). Include both general causes and specific needs. Section 1 draft
- approach (firm). Use of example requirements and example transforms to identify guidance
- requirement classification (things to represent, circumstances in which we need to distinguish absence in these representations)
- guidance
- catalog of transform examples
- Schedule draft
- 23-May choose meeting times
- 30-May agree on objectives; dispose ballot
- 6-Jun agree on outline & schedule
- 13-Jun assign parts; review sample part for common look and feel
- 20-Jun review drafts; agree on format
- 27-Jun review of chunk 1
- 4-Jul review of chunk 2
- 11-Jul review of chunk 3
- 18-Jul review of chunk 4
- 25-Jul review of chunk 5
- 1-Aug review of chunk 6
- 8-Aug final comments to editor
- 15-Aug finalize submission; due 8/19
- 19-Aug Final content submission due
Meeting Outcomes
Actions
|
Next Meeting/Preliminary Agenda Items |
© 2012 Health Level Seven® International. All rights reserved.