This wiki has undergone a migration to Confluence found Here
Difference between revisions of "20171025 inm agenda"
Jump to navigation
Jump to search
m (→Agenda) |
m (→Agenda) |
||
Line 22: | Line 22: | ||
#Management | #Management | ||
#*[https://gforge.hl7.org/gf/project/abs_trans_spec/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2FATS-Reaffirmation-PSS-2017.docx Abstract Transport Reaffirmation PSS] | #*[https://gforge.hl7.org/gf/project/abs_trans_spec/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2FATS-Reaffirmation-PSS-2017.docx Abstract Transport Reaffirmation PSS] | ||
+ | #**Out for e-vote closing October 29, 2017 at Midnight | ||
#Methodology | #Methodology | ||
#* V2 change management | #* V2 change management |
Revision as of 12:40, 25 October 2017
InM - Meeting (Date in Title)
InM Meeting logistics
Meeting time
- Meetings are at NOON eastern unless otherwise published.
Web meeting Info
- Please join my meeting from your computer, tablet or smartphone:
- Join the online meeting:
- Online Meeting Link: https://join.freeconferencecall.com/inm7
- Online Meeting ID: inm7
- Or use the dial-in
- If you plan to use a phone, join the meeting first, you will see the Dial-in number, Access code, and PIN that will associate your phone with your meeting session.
- Dial-in Number: (563) 999-1117 - United States
- Access Code: 891112
- International Dial-in Numbers: https://www.freeconferencecall.com/wall/inm7/#international
- For 24/7 customer service please call 844-844-1322
Agenda
- Call to order
- Roll Call
- Approval of Agenda and San Diego WGM Minutes
- Management
- Abstract Transport Reaffirmation PSS
- Out for e-vote closing October 29, 2017 at Midnight
- Abstract Transport Reaffirmation PSS
- Methodology
- V2 change management
- To ensure consistent change control InM as the V2 methodology group endorses the following procedure for all V2 document changes:
- Check out content from the repository (currently Gforge) with lock.
- Edit the document with change tracking on.
- Check the document into the repository (currently Gforge) with unlock.
- Note:The TSC has mandated that the source of truth for HL7 artifacts reside on HL7 managed servers.
- V2 change management
- Ack Choreography
- The ACK Choreography belongs in one of the two following places
- As a sub-heading under the message-pair definition
- As a separate heading in the chapter
- The ACK Choreography belongs in one of the two following places
- substantiveness of a v2-related ballot change
- V2.9 Ballot Reconciliation
- Other business and planning
- Shall we revisit GF#13848 Change messageheader.event data type from code to URI
- Adjournment
Meeting Information
HL7 ARB Work Group Meeting Minutes Location: Telcon |
Date: 20171018 Time: NOON U.S. Eastern | |||
Facilitator | Julian, Tony//Sandy Stuart//Dave Shaver | Note taker(s) | Julian, Tony//Sandy Stuart//Dave Shaver | |
Attendee | Name | Affiliation | ||
. | Julian, Tony(Co-Chair) | Mayo Clinic | ||
. | Stuart, Sandy (Co-Chair) | Kaiser Permanente | ||
. | Shaver, Dave(Co-Chair) | Corepoint Health | ||
. | ||||
Guests | ||||
. | ||||
. | ||||
Legend | ||||
X | Present | |||
. | Absent | |||
R | Regrets | |||
Quorum Requirements (Co-chair + 3) Met: Yes |