This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "ELRR2"

From HL7Wiki
Jump to navigation Jump to search
Line 56: Line 56:
  
 
==Project Documents==
 
==Project Documents==
*Link to Draft IG: [[ELR251R2 PHER Draft For Comment]]
+
*Link to Draft IG: file
 
<!--*Link to [http://gforge.hl7.org/gf/project/ project GForge]
 
<!--*Link to [http://gforge.hl7.org/gf/project/ project GForge]
 
*Link to reference documentation on [http://gforge.hl7.org/gf/project/ GForge], HL7 Web site [http://www.hl7.org/special/Committees/claims/docs.cfm WG Documents/Presentations page], or external web pages  
 
*Link to reference documentation on [http://gforge.hl7.org/gf/project/ GForge], HL7 Web site [http://www.hl7.org/special/Committees/claims/docs.cfm WG Documents/Presentations page], or external web pages  

Revision as of 06:40, 4 January 2013


Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)

Return to Public Health and Emergency Response

Project Information

Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).

In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .

This project would include the following work products:

  • 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
  • 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
  • 3) Associated message profiles


Specific Features and Functions include:

  • 1) IG document
  • 2) Message profiles
    • a. Implementation profile for base ORU-R01

Name the project facilitators

Link to project scope statement

file (waiting for CGIT approval)


Status

  • PSS reviewed and approved by PHER and OO, awaiting review by CGIT at Jan WGM
  • IG in Draft stage, see link below

Issues/Hot Topics

Project Documents

  • Link to Draft IG: file