This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "INM Work Distribution"

From HL7Wiki
Jump to navigation Jump to search
m
Line 39: Line 39:
 
*** editor: [[user:Ajulian|Tony Julian]]
 
*** editor: [[user:Ajulian|Tony Julian]]
 
** Chapter 2A
 
** Chapter 2A
*** editor: [[user:Ajulian|Tony Julian]]
+
*** editor: Sandy Stuart
 +
** Chapter 2C
 +
*** editor: Sandy Stuart
 
** Chapter 5
 
** Chapter 5
 
*** editor: Pete Gilbert
 
*** editor: Pete Gilbert

Revision as of 17:43, 17 September 2008

This page contains a description of the work distribution of the various INM committee workitems between the co-chairs.

INM has more work (overall) than it can take care of. Some issues may be declared as being of importance. Relative priorities may have to be assigned. Criteria could be:

  • implementation related issues, unresolved ambiguities in spec
  • ballot material where we've already committed to a partcular ballot cycle

Current Areas of Responsibility

Abstract Datatypes R2

Coordinator: Grahame  mailto:grahame@kestral.com.au

Wrappers R2

Coordinator: Scott Robertson mailto:scott.m.robertson@kp.org

Version 2.7

Coordinator: Tony Julian mailto:ajulian@mayoedu Tony Julian

Dynamic Model

Coordinator: Jingdong Li mailto:jingdong.li@saic.com

Prior Assignments

  • Transmission
    • Transmission Infrastructure (MCCI)
    • co-chair: Scott, backup: Rene, Tony/Grahame
  • Transport Overview (to be dropped or merged with ATS)
    • co-chair: Scott, backup: Grahame
  • Abstract Transport Specification (ATS)
    • editor: Miroslav, co-chair: Doug/Grahame
  • Liason work with SOA SIG (has implementation as well as abstract aspects)
    • liason: Miroslav (yet to be asked), backup: Grahame
  • Infrastructure Control Acts
    • MCAI, QUQI, MFMI
    • co-chair: Rene, backup: Doug (for QUQI)
  • Shared Message Types & Interactions
  • Data Types
    • Abstract Data Types
    • co-chair: Grahame, backup: Doug
  • HL7 Version 2
    • Chapter 2 (except section 2.6/2.7, those are maintained by the ITS SIG)
    • Chapter 2A
      • editor: Sandy Stuart
    • Chapter 2C
      • editor: Sandy Stuart
    • Chapter 5
      • editor: Pete Gilbert
    • Chapter 8
      • editor: Scott
    • Chapter 14

Note: V3 Application Management (chapter 14 in v2) has been removed from the list, will be included in COMT.