This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20130828 BAM Modeling"

From HL7Wiki
Jump to navigation Jump to search
m (moved 20130821 BAM Modeling to 20130828 BAM Modeling: 8/21 cancelled)
 
(One intermediate revision by the same user not shown)
Line 12: Line 12:
 
| colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 BAM Modeling Call Minutes''' <br/>
 
| colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 BAM Modeling Call Minutes''' <br/>
 
'''Location: '''call 770-657-9270 using code 985371#<br/> [https://global.gotomeeting.com/join/111567781 GTM 111-567-781]
 
'''Location: '''call 770-657-9270 using code 985371#<br/> [https://global.gotomeeting.com/join/111567781 GTM 111-567-781]
| colspan="2" align="left" style="background:#f0f0f0;"|'''Date: 2013-08-21'''<br/> '''Time: 2 pm Eastern Time'''
+
| colspan="2" align="left" style="background:#f0f0f0;"|'''Date: 2013-08-28'''<br/> '''Time: 2 pm Eastern Time'''
 
|-
 
|-
 
| colspan="1" align="right"|'''Facilitator'''
 
| colspan="1" align="right"|'''Facilitator'''
Line 37: Line 37:
 
===============================================================================--->
 
===============================================================================--->
 
|-
 
|-
| || Calvin Beebe
+
| x|| Calvin Beebe
 
|-
 
|-
 
| || Woody Beeler  
 
| || Woody Beeler  
Line 45: Line 45:
 
| ||Bo Dagnall
 
| ||Bo Dagnall
 
|-
 
|-
| || Jean Duteau,
+
|regrets || Jean Duteau,
 
|-
 
|-
 
| || Tony Julian  
 
| || Tony Julian  
 
|-
 
|-
| || Austin Kreisler,
+
|x || Austin Kreisler,
 
|-
 
|-
| || Lynn Laakso
+
| x|| Lynn Laakso
 
|-
 
|-
 
| || Cecil Lynch
 
| || Cecil Lynch
 
|-
 
|-
| || Ron Parker
+
|regrets || Ron Parker
 
|-
 
|-
 
| || Brian Pech
 
| || Brian Pech
Line 84: Line 84:
  
 
===Minutes===
 
===Minutes===
   
+
ArB attendance has dropped off due to FHIR ballot criteria. Probably become more organized around the WGM.  Austin off for the next two weeks, so let's cancel and call one just before the WGM and try to pull people in.
 +
 
 +
Product Line Architecture meeting Weds Q3 around the BAM. That would be the session to reassess the BAM and what to do going forward.  We've been overtaken by events this summer and the BAM has lost focus. Formalizing product families and rolling out a process for standing them up was exposed as a goal  in the address of the CDS vMR project issues.
 +
 
 +
 
 +
Austin will try to send out an agenda and reminder for the September 18th call.
 +
 
 +
Adjourned 2:10 PM
  
  
Line 115: Line 122:
  
 
|width="100%" |'''Next Meeting/Preliminary Agenda Items'''<br/>
 
|width="100%" |'''Next Meeting/Preliminary Agenda Items'''<br/>
*[[20130828 BAM Modeling]]
+
*[[20130918 BAM Modeling]]
  
 
|}
 
|}
  
 
© 2013 Health Level Seven® International.  All rights reserved
 
© 2013 Health Level Seven® International.  All rights reserved

Latest revision as of 18:12, 28 August 2013

TSC representatives and ArB to jointly develop content for the BAM for the Product Line Architecture Program

HL7 BAM Modeling Call Minutes

Location: call 770-657-9270 using code 985371#
GTM 111-567-781

Date: 2013-08-28
Time: 2 pm Eastern Time
Facilitator Austin Kreisler Note taker(s) Lynn
Attendee Name


x Calvin Beebe
Woody Beeler
Jane Curry
Bo Dagnall
regrets Jean Duteau,
Tony Julian
x Austin Kreisler,
x Lynn Laakso
Cecil Lynch
regrets Ron Parker
Brian Pech
Melva Peters
no quorum definition

Agenda

  • Agenda
    • PSS development for CDA R2 (R3?) IG Product Family.
    • Continue discussion on model diagram



Minutes

ArB attendance has dropped off due to FHIR ballot criteria. Probably become more organized around the WGM. Austin off for the next two weeks, so let's cancel and call one just before the WGM and try to pull people in.

Product Line Architecture meeting Weds Q3 around the BAM. That would be the session to reassess the BAM and what to do going forward. We've been overtaken by events this summer and the BAM has lost focus. Formalizing product families and rolling out a process for standing them up was exposed as a goal in the address of the CDS vMR project issues.


Austin will try to send out an agenda and reminder for the September 18th call.

Adjourned 2:10 PM


Meeting Outcomes

Actions
Next Meeting/Preliminary Agenda Items

© 2013 Health Level Seven® International. All rights reserved