This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "ITS Concall Minutes 20120320"

From HL7Wiki
Jump to navigation Jump to search
(Created page with "Category:ITS Minutes 2012 Return to: ITS Main Page > ITS Meeting Minutes > 2012 [[ITS_M...")
 
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
 
[[ITS_Meeting_Minutes|Return to ITS Meeting Minutes]]
 
[[ITS_Meeting_Minutes|Return to ITS Meeting Minutes]]
  
=ITS Teleconference - February 7, 2012=
+
=ITS Teleconference - March 20, 2012=
  
 
Present: Paul Knapp, (PK), Andy Stechishin (AS), Brian Pech (BP), Dale Nelson (DN)
 
Present: Paul Knapp, (PK), Andy Stechishin (AS), Brian Pech (BP), Dale Nelson (DN)
Line 16: Line 16:
 
==Agenda==
 
==Agenda==
 
#Role call and agenda  
 
#Role call and agenda  
#Approve Minutes of previous meeting [[ITS Concall Minutes 20120228|February 28]]#*Not posted
+
#Approve Minutes of previous meeting [[ITS Concall Minutes 20120207|February 7]]
 
#General items update
 
#General items update
 
#Reconciliation of Datatypes R1.1 Structures Guide
 
#Reconciliation of Datatypes R1.1 Structures Guide
Line 37: Line 37:
 
#Recirculation Ballots
 
#Recirculation Ballots
 
#*Determine if recirculation ballots are necessary for:
 
#*Determine if recirculation ballots are necessary for:
#*#
 
 
#Review of Product Briefs
 
#Review of Product Briefs
 
#Next Meeting
 
#Next Meeting
 
#Adjourn
 
#Adjourn
#
+
 
 
Called to order at 4:10 pm Eastern
 
Called to order at 4:10 pm Eastern
  
 
==Previous Minutes==
 
==Previous Minutes==
 
===February 7, 2012===
 
===February 7, 2012===
No quorum
+
Not posted
 +
 
 
==General Items==
 
==General Items==
 
#No need for recirculation ballot on RIM ITS, proceed to publish
 
#No need for recirculation ballot on RIM ITS, proceed to publish
Line 68: Line 68:
 
**Last action: PK will chase down outstanding negatives- January 31, 2012
 
**Last action: PK will chase down outstanding negatives- January 31, 2012
 
==ITS Guide 1.1 Reconciliation==
 
==ITS Guide 1.1 Reconciliation==
 +
Details posted in reconciliation spreadsheet
 
==Future Calls==
 
==Future Calls==
 
*To Be Scheduled
 
*To Be Scheduled

Latest revision as of 20:29, 10 April 2012

Return to: ITS Main Page > ITS Meeting Minutes > 2012

Return to ITS Meeting Minutes

ITS Teleconference - March 20, 2012

Present: Paul Knapp, (PK), Andy Stechishin (AS), Brian Pech (BP), Dale Nelson (DN)

Chair: PK

Scribe: AS

Agenda

  1. Role call and agenda
  2. Approve Minutes of previous meeting February 7
  3. General items update
  4. Reconciliation of Datatypes R1.1 Structures Guide
    • Disposition captured in the reconciliation spreadsheet
    • Document will be reworked and discussed in Vancouver
  5. Action Item Update
    • Datatypes 1.1: reconciliation package is posted
      • Last action: Withdrawal of negatives has been requested from the appropriate balloters - January 31, 2012
    • Structures and Guides 1.1
      • Last action: Structures has been reconciled and requested withdrawals - January 31, 2012
      • Last action: Guides is informative and PK will investigate next action - January 31, 2012
    • Web Services
      • Last action: Vassil Peytchev has not reported if he can assist with Web Services
    • InM Abstract Transports
      • Last action: dependant on Wrappers, will park until January. If Wrappers produces, will pick up again. If Wrappers is much longer/larger or stalled, the portion of the Abstract will be sectioned off. Separate calls will scheduled to move this forward
    • R2B schemas
      • Last action: PK met with principals and they believe this can be moved forward.
    • Wiki page update:
      • Last action: AS reported Yunwei Wang will assist
  6. Recirculation Ballots
    • Determine if recirculation ballots are necessary for:
  7. Review of Product Briefs
  8. Next Meeting
  9. Adjourn

Called to order at 4:10 pm Eastern

Previous Minutes

February 7, 2012

Not posted

General Items

  1. No need for recirculation ballot on RIM ITS, proceed to publish
  2. Request sent to G Shadow to withdraw negative on ITS Structures ballot
  3. Note sent to Structured Documents to discuss pursuing the backward compatible datatypes for use in CDA R2.1

Action Items

  • Datatypes 1.1: reconciliation package is posted
    • Withdrawal of negatives has been requested from the appropriate balloters - January 31, 2012
  • Structures and Guides 1.1
    • Structures has been reconciled and requested withdrawals - January 31, 2012
    • Guides is informative and PK will investigate next action - January 31, 2012
  • Web Services
    • Last action: Vassil Peytchev has not reported if he can assist with Web Services (in San Diego) - no update
  • InM Abstract Transports
    • Last action: Separate calls will scheduled to move this forward - January 31, 2012
  • R2B schemas
    • PK met with principles and they believe this can be moved forward.
  • Wiki page update:
    • Last action: AS presented the work that he and Yunwei Wang had completed over previous week, updates should be complete by next meeting - February 7, 2012
  • ISO Datatypes release 1 - outstanding negatives
    • Last action: PK will chase down outstanding negatives- January 31, 2012

ITS Guide 1.1 Reconciliation

Details posted in reconciliation spreadsheet

Future Calls

  • To Be Scheduled
    • Review of Product Briefs

Adjourn

Call finished 5:07 Eastern