Difference between revisions of "Clinical Trials Registration and Results"
(19 intermediate revisions by the same user not shown) | |||
Line 20: | Line 20: | ||
[http://wiki.hl7.org/images/8/83/HL7_CTR%26R_Public_Meeting_-_Dec_10th.zip Public Meeting Presentation] | [http://wiki.hl7.org/images/8/83/HL7_CTR%26R_Public_Meeting_-_Dec_10th.zip Public Meeting Presentation] | ||
+ | |||
+ | Presentation from the June 17, 2010 - DIA Annual Meeting: | ||
+ | |||
+ | [http://wiki.hl7.org/images/b/b3/DIA_Annual_-_Getzin_Scott_Clinical_Trial_Registration_and_Results_Project_Update_and_Future_Use_Case.zip DIA Annual Meeting] | ||
+ | |||
+ | Project from the September 14, 2011 - DIA - CT Disclosure Meeting: | ||
+ | |||
+ | [http://wiki.hl7.org/images/0/08/DIA_Sept_2011-_Getzin_-_Clinical_Trial_Registration_and_Results_Project_Update.pptx DIA CT Disclosure Meeting] | ||
. | . | ||
Line 32: | Line 40: | ||
Tracy Beck (Lilly) - becktj@lilly.com | Tracy Beck (Lilly) - becktj@lilly.com | ||
− | + | Sarah Larson (Genzyme) - Sarah.Larson@genzyme.com | |
+ | |||
. | . | ||
− | ==Project | + | ==Project Working Documents== |
− | + | ||
+ | Active Working Documents are stored on GFORGE: | ||
+ | [http://gforge.hl7.org/gf/project/ctrr/scmsvn/?action=browse&path=%2Ftrunk%2F CTRR - GFORGE Location] | ||
+ | |||
+ | Other CTRR Historical Documents: | ||
− | |||
[[CTRR Working Documents]] | [[CTRR Working Documents]] | ||
+ | . | ||
==Project Team Participation== | ==Project Team Participation== | ||
[http://wiki.hl7.org/images/7/7e/How_to_get_connected_to_the_Clinical_Trial_Registration_and_Results.doc How to Get Connected] | [http://wiki.hl7.org/images/7/7e/How_to_get_connected_to_the_Clinical_Trial_Registration_and_Results.doc How to Get Connected] | ||
− | * Telecom: 770-657-9270 . Passcode: | + | * Telecom: 770-657-9270 . Passcode: 7458962 |
− | |||
* Goto Meeting: https://www2.gotomeeting.com/join/567159050 | * Goto Meeting: https://www2.gotomeeting.com/join/567159050 | ||
Line 53: | Line 65: | ||
. | . | ||
− | ==HL7 CTRR Ballot Materials - May 2010== | + | ==HL7 CTRR Ballot Materials - May 2010 - DSTU== |
* The XSD, HDM, JPG and VSD files are contained in the attached [http://wiki.hl7.org/images/b/ba/CTRR_-_Schema_-_PORT_MT140001UV.zip zip file] | * The XSD, HDM, JPG and VSD files are contained in the attached [http://wiki.hl7.org/images/b/ba/CTRR_-_Schema_-_PORT_MT140001UV.zip zip file] | ||
* Additional HL7 Core Schemas required for the above CTRR schema [http://wiki.hl7.org/images/9/9a/HL7_Addl_core_schemas.zip zip file] | * Additional HL7 Core Schemas required for the above CTRR schema [http://wiki.hl7.org/images/9/9a/HL7_Addl_core_schemas.zip zip file] | ||
+ | |||
* [http://wiki.hl7.org/images/e/ea/CTRR_Domain_Analysis_Model.zip CTRR Domain Analysis Model] | * [http://wiki.hl7.org/images/e/ea/CTRR_Domain_Analysis_Model.zip CTRR Domain Analysis Model] | ||
Line 63: | Line 76: | ||
* [http://wiki.hl7.org/images/1/16/CTRR_Data_Requirements_to_BRIDG_Model_Element_Mapping.zip CTRR Data Requirements to BRIDG Model Element Mapping] . (Requires Excel 2007) | * [http://wiki.hl7.org/images/1/16/CTRR_Data_Requirements_to_BRIDG_Model_Element_Mapping.zip CTRR Data Requirements to BRIDG Model Element Mapping] . (Requires Excel 2007) | ||
+ | |||
+ | . | ||
+ | |||
+ | ==HL7 CTRR Ballot Reconciliation for May 2010== | ||
+ | |||
+ | [http://wiki.hl7.org/images/2/22/CTRR_-_May_2010_-_Ballot_Reconciliation_20101006.zip RCRIM Approved Ballot Reconciliation Results] | ||
. | . | ||
Line 82: | Line 101: | ||
* [http://wiki.hl7.org/images/8/8f/HL7_v3_Reference_Models_March_2008_-_Part_2.zip HL7 v3 Reference Models Introduction - Part 2] | * [http://wiki.hl7.org/images/8/8f/HL7_v3_Reference_Models_March_2008_-_Part_2.zip HL7 v3 Reference Models Introduction - Part 2] | ||
+ | |||
+ | * Here is a [http://blogs.sun.com/vishblogs/entry/understanding_hl7_v3_from_developer link] to an article that explains the HL7 message development process and the artifact naming convention. | ||
+ | |||
+ | . | ||
+ | |||
+ | ==Project Testing Page== | ||
+ | [[CTRR Testing Page]] | ||
. | . | ||
Line 100: | Line 126: | ||
− | ''' | + | '''October 2010 - Begin Testing (likely period - 6 to 12 months)''' |
* Develop Implementation Guide based on Testing | * Develop Implementation Guide based on Testing | ||
− | ''' | + | '''May 2011 – Ballot''' |
* Normative Ballot (providing all ballot materials including the implementation guide) | * Normative Ballot (providing all ballot materials including the implementation guide) | ||
− | ''' | + | '''June 2011 - Begin Implementation and Production Use!!''' |
Latest revision as of 14:26, 28 November 2011
Return to RCRIM main page
Clinical Trials Registration and Results - WIKI page
The intent of this page is to have a repository of documents or artifacts associated with the Clinical Trials Registration and Results project.
Contents
- 1 Project Scope
- 2 Project Leads
- 3 Project Working Documents
- 4 Project Team Participation
- 5 HL7 CTRR Ballot Materials - May 2010 - DSTU
- 6 HL7 CTRR Ballot Reconciliation for May 2010
- 7 HL7 Voting Introduction
- 8 Other HL7 Educational Materials
- 9 Project Testing Page
- 10 Overall Project Timeline (subject to change)
Project Scope
This document was amended and approved by RCRIM on November 25, 2008
CTR&R Project Scope - From project Insight
CTR&R Project Scope - MSWord File
Approved Project Charter on January 21, 2009:
Presentation from the December 10, 2008 - Public Meeting:
Presentation from the June 17, 2010 - DIA Annual Meeting:
Project from the September 14, 2011 - DIA - CT Disclosure Meeting:
.
Project Leads
If you have any issues or concerns, please contact one of the following:
Scott Getzin (Lilly) – sgetzin@lilly.com
Ed Helton (NCI) – heltone2@mail.nih.gov
Tracy Beck (Lilly) - becktj@lilly.com
Sarah Larson (Genzyme) - Sarah.Larson@genzyme.com
.
Project Working Documents
Active Working Documents are stored on GFORGE:
Other CTRR Historical Documents:
.
Project Team Participation
- Telecom: 770-657-9270 . Passcode: 7458962
- Goto Meeting: https://www2.gotomeeting.com/join/567159050
.
HL7 CTRR Ballot Materials - May 2010 - DSTU
- The XSD, HDM, JPG and VSD files are contained in the attached zip file
- Additional HL7 Core Schemas required for the above CTRR schema zip file
- CTRR Data Requirements to BRIDG Model Element Mapping . (Requires Excel 2007)
.
HL7 CTRR Ballot Reconciliation for May 2010
RCRIM Approved Ballot Reconciliation Results
.
HL7 Voting Introduction
or
- HL7 Voting Background - Part 1
- HL7 Voting Ballot Desktop - Part 2
- HL7 Voting Understanding the Ballot Materials - Part 3
- HL7 Voting Casting Ballot - Part 4
.
Other HL7 Educational Materials
- Here is a link to an article that explains the HL7 message development process and the artifact naming convention.
.
Project Testing Page
.
Overall Project Timeline (subject to change)
May 2009 – Message Development
- Complete Storyboards, Interaction and Activity Diagrams, Trigger Events, etc...
- Develop CTRR HL7 Models based on existing artifacts
January 2010 – Ballot
- DSTU Ballot - Draft Standard for Trial Use (providing all ballot materials including the model)
May 2010 – Ballot
- DSTU Ballot - Draft Standard for Trial Use (including EMEA requirements)
October 2010 - Begin Testing (likely period - 6 to 12 months)
- Develop Implementation Guide based on Testing
May 2011 – Ballot
- Normative Ballot (providing all ballot materials including the implementation guide)
June 2011 - Begin Implementation and Production Use!!