This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "INM San Antonio 2008 Agenda"

From HL7Wiki
Jump to navigation Jump to search
 
(15 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Return to [[Infrastructure and Messaging TC]]
 
Return to [[Infrastructure and Messaging TC]]
 
<br>Notify  
 
<br>Notify  
<code>mailto:ajulian@mayo.edu?subject=INM_Atlanta_Agenda</code> of any changes prior to 16:00EDT 20070111.
+
<code>mailto:ajulian@mayo.edu?subject=INM_Atlanta_Agenda</code> of any changes prior to 16:00EDT 20071217.
 
== Major Topics ==
 
== Major Topics ==
 
* Ballot reconciliation
 
* Ballot reconciliation
Line 9: Line 9:
 
**Data Types
 
**Data Types
 
* v2.7 proposals - all v2.7 proposals must be finalized by end of meeting
 
* v2.7 proposals - all v2.7 proposals must be finalized by end of meeting
** 476 Minimum Length to be revisited: We MUST publicize this for maximum attendance.  Suggest first Item in the quarter, so that interested parties may attend.
 
** 514 Update XCN, XPN, XAD, XTN and CWE fields currently having sequence-based meaning.
 
** 520 Add third triplet to C*E data types
 
** 522 Replace IS with CWE.
 
** 523 Change CWE.3, CWE.6, CNE.3, CNE.6 to Conditional
 
** 541 Modify CF to be consistent with CWE/CNE
 
 
* v2.7 Repetition precedence - see 10070702 INM Telcon Minutes
 
* v2.7 Repetition precedence - see 10070702 INM Telcon Minutes
 
* Wrappers (Tues)
 
* Wrappers (Tues)
Line 25: Line 19:
  
 
* Mon Q1 Election, Meeting Overview
 
* Mon Q1 Election, Meeting Overview
* Mon Q2 V2: Proposal 476
+
* Mon Q2 V2: Proposal 476, and others if time
 
* Mon Q3 Joint with MnM, MnM Hosting : wrappers, dynamic model
 
* Mon Q3 Joint with MnM, MnM Hosting : wrappers, dynamic model
 
* Mon Q4 Joint with Conformance: cardinality and optionality in v2 + 476 followup
 
* Mon Q4 Joint with Conformance: cardinality and optionality in v2 + 476 followup
Line 32: Line 26:
 
* Tues Q3 INM Hosts Joint INM/SOA/ITS SIG/HSSP Services  
 
* Tues Q3 INM Hosts Joint INM/SOA/ITS SIG/HSSP Services  
 
* Tues Q4 Datatypes Ballot Resolution
 
* Tues Q4 Datatypes Ballot Resolution
* Wed Q1 HL7 v2
+
* Wed Q1 HL7 v2 Proposals
 
* Wed Q2 Datatypes Ballot Resolution
 
* Wed Q2 Datatypes Ballot Resolution
 
* Wed Q3 Shared Messages Ballot Resolution
 
* Wed Q3 Shared Messages Ballot Resolution
* Wed Q4 Hosting joint meeting with Vocab
+
* Wed Q4 Hosting joint meeting with Vocab V3
 
* Thurs Q1 Joint session between SOA, INM, MnM and ITS on the Dynamic Model.
 
* Thurs Q1 Joint session between SOA, INM, MnM and ITS on the Dynamic Model.
 
* Thurs Q2 Joint meeting with ITS SIG
 
* Thurs Q2 Joint meeting with ITS SIG
* Thurs Q3 HL7 v2:
+
* Thurs Q3 Hosting joint meeting with Vocab  v2  
* Thurs Q4 Overflow (to be arranged during the meeting)  
+
* Thurs Q4 Overflow V2.7 Proposals, and otherwise(to be arranged during the meeting)  
 
* Fri Q1/Q2 Wrap-up meeting
 
* Fri Q1/Q2 Wrap-up meeting
  
 
== Details ==
 
== Details ==
'''NOT UPDATED'''
+
'''Monday 14 Jan'''
'''Monday 17 Sept'''
+
* Mon Q1 Election, Meeting Overview
 
 
* Q1 Plenary
 
* Q2 Plenary
 
* Q3 Joint with MnM, MnM Hosting : wrappers, dynamic model
 
** Cologne: Dynamic assumptions made by INM as preparation for Wrappers 2, see [[INM assumptions with regards to CPM]]
 
** Cologne: Function of CACT, what could percievable be moved there? Generalized question, started by [[Adding Record Target to ControlAct]]
 
** Cologne: Dynamic model – trigger event vs interactionId (Mark T), see [[Interaction (new dynamic model)]]
 
** Cologne: Action 2024: [[Transmission Addressing]] (time permitting)
 
* Q4 Meeting Overview and v2.x
 
 
** Election of two co-chairs
 
** Election of two co-chairs
 
** Approval of Meeting Agenda
 
** Approval of Meeting Agenda
** Approval of the Cologne minutes
+
** Approval of the Atlanta minutes
 
** Announcements
 
** Announcements
 
** Meeting Overview (max 30 min)
 
** Meeting Overview (max 30 min)
Line 62: Line 47:
 
*** Mission statement review
 
*** Mission statement review
 
*** Decision making process document
 
*** Decision making process document
** Cologne: [[INM Action Items]]: Organizational/procedural action items: 1025, 1072, 1083, 1127, 1128
+
** HL7 v2.7 proposals Overview
** Including all v2 conformance related issues
 
** HL7 v2.7 proposals
 
** Cologne: Action items: 15, 976, 1029, 1057, 1058, 1059, 1089, 1100, 1103, 1126, 1137
 
  
'''Tuesday 18 Sept '''
+
* Mon Q2 V2: Proposal 476 [[Proposal_476]]
* Q1 Transmission Wrappers R2
+
** Proposal 476 was accepted at the WGM in Koln.  Since then, many have requested to revisit this.
** Cologne: [[INM Transmission and Transport Action Items]]: 178, 1018, 2015, 2024, 2030, 2031, 2032, 2033, 2034, 2035
+
* Mon Q3 Joint with MnM, MnM Hosting : wrappers, dynamic model
** Cologne: Discussion and formal approval of Harmonization Proposals (if any)
+
* Mon Q4 Joint with Conformance: cardinality and optionality in v2 + 476 followup
** Cologne: Other open issues created before start of the Wrappers R2 project, see [[MCCI R2]].
 
** Cologne: [[Transmission Wrapper (new wrapper mechanism)]]
 
** Cologne: [[Behavioral Contract Wrapper (new wrapper mechanism)]]
 
* Q2 Wrappers R2 (Transmission and ControlAct wrapper)
 
** Cologne: [[MCCI/CACT R2 Project]]
 
* Q3 INM Hosts Joint INM/SOA/ITS SIG/HSSP Services
 
** "Interoperability Paradigms" (led by John Koisch per Alan Honey)
 
** Cologne: ebXML implications for SOA
 
* Q4 Hot Topics quarter
 
** Cologne: Dutch batch error grouping issue, [[Orchestration of Error Responses in a Batch]], [[QueryAck in Batches]]
 
** Cologne: Action items as participants are available
 
  
'''Wednesday 19 Sept'''
+
'''Tuesday 15 Jan'''
* Q1 Transports / Messaging Infrastructure
+
* Tues Q1 Wrappers R2 Taskforce
*** Cologne: [[Open ATS Issues]]
+
* Tues Q2 Wrappers R2 Taskforce  
** Cologne: Action items: 1019, 2010, 2017, 2020
+
* Tues Q3 INM Hosts Joint INM/SOA/ITS SIG/HSSP Services
** Cologne: ebXML status update
+
* Tues Q4 Datatypes Ballot Resolution
** Cologne: Removable Media, Web services status update
 
** Cologne: Attachments, reforming of messages by transports / vitual transmission wrappers
 
* Q2 Data Types R2 Taskforce [[Data Types R2 issues]]
 
** Ballot Comments Consideration
 
* Q3 ControlAct Wrappers and Shared Messages - COMT, MCAI, QUQI, MFMI.
 
** Cologne: Action items: 33, 961, 1084, 1099, 1122, 1125, 1131, 1132, 1133
 
** Cologne: Open issues, see [[CACT R2]]
 
*** Cologne: [[Adding Record Target to ControlAct]]
 
*** Cologne: [[Consent in Queries]]
 
  
* Q4 Hosting joint meeting with Vocab
+
'''Wednesday 16 Jan'''
** v2/v3 vocabulary issues
+
* Wed Q1 HL7 v2
** R2 datatype issues
+
**514 Update XCN, XPN, XAD, XTN and CWE fields currently having sequence-based meaning.
*** Pending Harmonization Proposals
+
**436 Fix MSH2 length to 4
*** CD.expression
+
**515 Withdraw fields
*** type of CO.value
+
**538 New codes table 203
*** CE / CE.None
+
**545 New codes table 301
*** other ballot items
+
* Wed Q2 Datatypes Ballot Resolution
** Cologne: Action items: 1113
+
* Wed Q3 Shared Messages Ballot Resolution
 
+
** One negative with 3 comments
'''Thursday 20 Sept'''
+
* Wed Q4 Hosting joint meeting with Vocab V3
* Q1 joint session between SOA, INM, MnM and ITS on the Dynamic Model.
 
[[Interaction (new dynamic model)]], trigger event / interactionID
 
  
 +
'''Thursday 17 Jan'''
 +
* Q1 Joint session between SOA, INM, MnM and ITS on the Dynamic Model.
 
* Q2 Joint meeting with ITS SIG
 
* Q2 Joint meeting with ITS SIG
** ISO datatypes ballot status review
+
* Q3 Hosting joint meeting with Vocab V2
** Cologne: Action items:
+
**520 Add third triplet to C*E data types
** Cologne: [[Serialization]], clarify?
+
**522 Replace IS with CWE.
** Cologne: [[Transmission Attachment]]
+
**523 Change CWE.3, CWE.6, CNE.3, CNE.6 to Conditional
* Q3 Wrappers R2 Taskforce
+
**540 V2.7 ValueSet Proposal
** Cologne: ?
+
**541 Modify CF to be consistent with CWE/CNE
* Q4 Hot Topics
+
**537 V2 Flavor of Null
** Cologne: Walk in session, all v3 and v2 topics
+
**548 OIDs in Coded Data Types (added 2008-01-08)
 +
* Q4 Overflow (to be arranged during the meeting)
  
'''Friday 21 Sept '''
+
'''Friday 18 Jan'''
 
* Q1/Q2 Wrap-up meeting
 
* Q1/Q2 Wrap-up meeting
 
** Action items:
 
** Action items:
** HL7 v2.7 proposals (if any)
+
** HL7 v2.7 proposals  
 +
***P534 New SS and CWES data types Per request
 
** Java SIG update & status evaluation
 
** Java SIG update & status evaluation
 
** Action items: see MON Q1
 
** Action items: see MON Q1
Line 133: Line 97:
 
** co-Chair responsibilities
 
** co-Chair responsibilities
 
** Agenda for next WGM
 
** Agenda for next WGM
 +
 +
== V2 Proposals ==
 +
** 476 Minimum Length to be revisited:
 +
**P436 Fix MSH2 length to 4
 +
**P482 Add staff signature to STF
 +
**P495 Character-Constrained String of Decimal Digits
 +
**P496 XTN Data Type Change
 +
**P497 move all tables to separetly ballotable document
 +
**P514 fields with sequence
 +
**P515 withdraw fields
 +
**P520 expand c*e Datatype
 +
**P522 Replace IS Datatype
 +
**P534 NewSS and CWES datatypes
 +
**P537 V2 Flavor of null
 +
**P538 New codes table 203
 +
**P540 V27ValueSet Proposal
 +
**P541 CF datatype
 +
**P545 NewCodes table301
 +
**P548 OIDs in Coded Data Types

Latest revision as of 06:12, 9 January 2008

Draft InM Agenda for San Antonio(January 2008).

Return to Infrastructure and Messaging TC
Notify mailto:ajulian@mayo.edu?subject=INM_Atlanta_Agenda of any changes prior to 16:00EDT 20071217.

Major Topics

  • Ballot reconciliation
    • Shared messages
    • Data Types
  • v2.7 proposals - all v2.7 proposals must be finalized by end of meeting
  • v2.7 Repetition precedence - see 10070702 INM Telcon Minutes
  • Wrappers (Tues)
  • Hot Topics - will query list, if none then will not schedule and will assess whether to continue in future meetings
    • No Hot Topics were forthcoming

Overview

  • Mon Q1 Election, Meeting Overview
  • Mon Q2 V2: Proposal 476, and others if time
  • Mon Q3 Joint with MnM, MnM Hosting : wrappers, dynamic model
  • Mon Q4 Joint with Conformance: cardinality and optionality in v2 + 476 followup
  • Tues Q1 Wrappers R2 Taskforce
  • Tues Q2 Wrappers R2 Taskforce
  • Tues Q3 INM Hosts Joint INM/SOA/ITS SIG/HSSP Services
  • Tues Q4 Datatypes Ballot Resolution
  • Wed Q1 HL7 v2 Proposals
  • Wed Q2 Datatypes Ballot Resolution
  • Wed Q3 Shared Messages Ballot Resolution
  • Wed Q4 Hosting joint meeting with Vocab V3
  • Thurs Q1 Joint session between SOA, INM, MnM and ITS on the Dynamic Model.
  • Thurs Q2 Joint meeting with ITS SIG
  • Thurs Q3 Hosting joint meeting with Vocab v2
  • Thurs Q4 Overflow V2.7 Proposals, and otherwise(to be arranged during the meeting)
  • Fri Q1/Q2 Wrap-up meeting

Details

Monday 14 Jan

  • Mon Q1 Election, Meeting Overview
    • Election of two co-chairs
    • Approval of Meeting Agenda
    • Approval of the Atlanta minutes
    • Announcements
    • Meeting Overview (max 30 min)
      • Ballot/proposal overview
      • Mission statement review
      • Decision making process document
    • HL7 v2.7 proposals Overview
  • Mon Q2 V2: Proposal 476 Proposal_476
    • Proposal 476 was accepted at the WGM in Koln. Since then, many have requested to revisit this.
  • Mon Q3 Joint with MnM, MnM Hosting : wrappers, dynamic model
  • Mon Q4 Joint with Conformance: cardinality and optionality in v2 + 476 followup

Tuesday 15 Jan

  • Tues Q1 Wrappers R2 Taskforce
  • Tues Q2 Wrappers R2 Taskforce
  • Tues Q3 INM Hosts Joint INM/SOA/ITS SIG/HSSP Services
  • Tues Q4 Datatypes Ballot Resolution

Wednesday 16 Jan

  • Wed Q1 HL7 v2
    • 514 Update XCN, XPN, XAD, XTN and CWE fields currently having sequence-based meaning.
    • 436 Fix MSH2 length to 4
    • 515 Withdraw fields
    • 538 New codes table 203
    • 545 New codes table 301
  • Wed Q2 Datatypes Ballot Resolution
  • Wed Q3 Shared Messages Ballot Resolution
    • One negative with 3 comments
  • Wed Q4 Hosting joint meeting with Vocab V3

Thursday 17 Jan

  • Q1 Joint session between SOA, INM, MnM and ITS on the Dynamic Model.
  • Q2 Joint meeting with ITS SIG
  • Q3 Hosting joint meeting with Vocab V2
    • 520 Add third triplet to C*E data types
    • 522 Replace IS with CWE.
    • 523 Change CWE.3, CWE.6, CNE.3, CNE.6 to Conditional
    • 540 V2.7 ValueSet Proposal
    • 541 Modify CF to be consistent with CWE/CNE
    • 537 V2 Flavor of Null
    • 548 OIDs in Coded Data Types (added 2008-01-08)
  • Q4 Overflow (to be arranged during the meeting)

Friday 18 Jan

  • Q1/Q2 Wrap-up meeting
    • Action items:
    • HL7 v2.7 proposals
      • P534 New SS and CWES data types Per request
    • Java SIG update & status evaluation
    • Action items: see MON Q1
    • Meeting evaluation
    • Ballot status
    • Direction of INM
    • co-Chair responsibilities
    • Agenda for next WGM

V2 Proposals

    • 476 Minimum Length to be revisited:
    • P436 Fix MSH2 length to 4
    • P482 Add staff signature to STF
    • P495 Character-Constrained String of Decimal Digits
    • P496 XTN Data Type Change
    • P497 move all tables to separetly ballotable document
    • P514 fields with sequence
    • P515 withdraw fields
    • P520 expand c*e Datatype
    • P522 Replace IS Datatype
    • P534 NewSS and CWES datatypes
    • P537 V2 Flavor of null
    • P538 New codes table 203
    • P540 V27ValueSet Proposal
    • P541 CF datatype
    • P545 NewCodes table301
    • P548 OIDs in Coded Data Types