This wiki has undergone a migration to Confluence found Here
Difference between revisions of "ELRR2"
Jump to navigation
Jump to search
Line 57: | Line 57: | ||
==Project Documents== | ==Project Documents== | ||
− | *Link to Draft IG: [[Media:HL7v2.5.1 IG ELR R2 PHER DRAFT FOR COMMENT.docx]] | + | *Link to Draft IG: [[Media:HL7v2.5.1 IG ELR R2 PHER DRAFT FOR COMMENT.docx]] |
+ | *Link to Outline and Notes document: [[]] | ||
<!--*Link to [http://gforge.hl7.org/gf/project/ project GForge] | <!--*Link to [http://gforge.hl7.org/gf/project/ project GForge] | ||
*Link to reference documentation on [http://gforge.hl7.org/gf/project/ GForge], HL7 Web site [http://www.hl7.org/special/Committees/claims/docs.cfm WG Documents/Presentations page], or external web pages | *Link to reference documentation on [http://gforge.hl7.org/gf/project/ GForge], HL7 Web site [http://www.hl7.org/special/Committees/claims/docs.cfm WG Documents/Presentations page], or external web pages |
Revision as of 16:42, 10 January 2013
Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)
Return to Public Health and Emergency Response
- Project co-sponsors
Project Information
Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).
In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .
This project would include the following work products:
- 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 3) Associated message profiles
Specific Features and Functions include:
- 1) IG document
- 2) Message profiles
- a. Implementation profile for base ORU-R01
Name the project facilitators
- Rita Altamore (WA State DOH) Rita.Altamore@DOH.WA.GOV
- Eric Haas (Contractor for APHL) ehaas@tsjg.com
- Riki Merrick (Contractor for APHL) rikimerrick@gmail.com
Link to project scope statement
media:PSS_ELR_r4.doc (waiting for CGIT approval)
Status
- PSS reviewed and approved by PHER and OO, awaiting review by CGIT at Jan WGM
- IG in Draft stage, see link below
Issues/Hot Topics
Project Documents
- Link to Draft IG: Media:HL7v2.5.1 IG ELR R2 PHER DRAFT FOR COMMENT.docx
- Link to Outline and Notes document: [[]]