This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "MnM Minutes CC 20071005"

From HL7Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
==Agenda==
 
==Agenda==
 
*Editing Project Peer Review (Ioana)  
 
*Editing Project Peer Review (Ioana)  
 +
** Peer review form to complete and e-mail to Jay:[http://informatics.mayo.edu/wiki/images/f/fe/PeerReviewForm_%282%29.doc Peer Review Form]
 +
** Document to review.[http://informatics.mayo.edu/wiki/images/4/43/RIM_Document_Assessment_08.doc  RIM Assessment document ]
  
 
==Attendees==  
 
==Attendees==  
 
Sarah Ryan, Jay Lyle, Dale Nelson, Ioana Singureanu
 
Sarah Ryan, Jay Lyle, Dale Nelson, Ioana Singureanu
  
==Agenda==
+
==Meeting Notes==
 
+
Jay provided an overview of the process, objectives, and scope of the editing project and, specifically, the RIM editing activities.The editing project is intended to address confusing, incorrect, incomplete guidance, omissions - in the core specifications (RIM and Vocabulary for now). This effort of editing the documentation should be an on-going, operational effort in the future.  For  now, the project team is attemptiong to fix problem with the existing materials.  
*Editing Project Peer Review (Ioana)
 
 
 
** Peer review form to complete and e-mail to Jay:[http://informatics.mayo.edu/wiki/images/f/fe/PeerReviewForm_%282%29.doc Peer Review Form]
 
** Document to review.[http://informatics.mayo.edu/wiki/images/4/43/RIM_Document_Assessment_08.doc  RIM Assessment document ]
 
 
 
The editing project is intended to address confusing, incorrect, incomplete guidance, omissions - in the core specifications (RIM and Vocabulary for now). This effort of editing the documentation should be an on-going, operational effort in the future.  For  now, the project team is attemptiong to fix problem with the existing materials.  
 
  
 
# We need to agree on the criteria listed in the "RIM Assessment Document"
 
# We need to agree on the criteria listed in the "RIM Assessment Document"
Line 30: Line 26:
  
 
Dale to provide Jay the WARTS materials.
 
Dale to provide Jay the WARTS materials.
 +
 +
--[[User:Ioana13|Ioana13]] 14:30, 5 October 2007 (CDT)

Revision as of 19:30, 5 October 2007

M&M Conference Call, October 5, 2007

(for more detail refer to meeting schedule)

Agenda

Attendees

Sarah Ryan, Jay Lyle, Dale Nelson, Ioana Singureanu

Meeting Notes

Jay provided an overview of the process, objectives, and scope of the editing project and, specifically, the RIM editing activities.The editing project is intended to address confusing, incorrect, incomplete guidance, omissions - in the core specifications (RIM and Vocabulary for now). This effort of editing the documentation should be an on-going, operational effort in the future. For now, the project team is attemptiong to fix problem with the existing materials.

  1. We need to agree on the criteria listed in the "RIM Assessment Document"
  2. Close the peer review of the "RIM Assessment Document" by Nov. 3rd
  3. Review the documents and provide the following:
    1. A copy of the original text with tracking turned on edits marked to illustrate the changes
    2. List of issues and omissions (keyed to the page and line number)


Open issue

If the semantics are clarified, how are those clarifications going to be verified in all the specification that use the clarified concepts?


Action Items:

Dale to provide Jay the WARTS materials.

--Ioana13 14:30, 5 October 2007 (CDT)