This wiki has undergone a migration to Confluence found Here
Difference between revisions of "20160531 arb minutes"
Jump to navigation
Jump to search
m |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 20: | Line 20: | ||
#Roll Call | #Roll Call | ||
#Approval of Agenda and [[2016_ARB_Montreal_WGM | WGM Minutes]] | #Approval of Agenda and [[2016_ARB_Montreal_WGM | WGM Minutes]] | ||
− | |||
− | |||
− | |||
#Governance | #Governance | ||
#Methodology (60 minutes) | #Methodology (60 minutes) | ||
+ | |||
+ | #*[http://gforge.hl7.org/gf/project/arbgeneral/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2FHL7%2520Project%2520Scope%2520Statement%2520v2015.1_CIMI_POC_d20160511.docx CIMI Proof of concept] | ||
+ | #**Is this a new product? Family? Where does it fit? | ||
#*SAIF super light | #*SAIF super light | ||
#**We are asked to prepare an explanation of the ISM, and how to use it | #**We are asked to prepare an explanation of the ISM, and how to use it | ||
#Other business and planning | #Other business and planning | ||
+ | #*Conformance Testing for ONC | ||
#Adjournment | #Adjournment | ||
Line 37: | Line 38: | ||
|- | |- | ||
| width="10%" colspan="1" align="right"|'''Facilitator''' | | width="10%" colspan="1" align="right"|'''Facilitator''' | ||
− | | width="35%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] | + | | width="35%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] |
| width="10%" colspan="1" align="right"|'''Note taker(s)''' | | width="10%" colspan="1" align="right"|'''Note taker(s)''' | ||
− | | width="30%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] | + | | width="30%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] |
|- | |- | ||
| border="4" cellpadding="1" colspan="4" style="background:#f0f0f0;"| | | border="4" cellpadding="1" colspan="4" style="background:#f0f0f0;"| | ||
Line 47: | Line 48: | ||
|colspan="2"|'''Affiliation''' | |colspan="2"|'''Affiliation''' | ||
|- | |- | ||
− | | | + | |X||Bond,Andy |
|colspan="2"|NEHTA | |colspan="2"|NEHTA | ||
|- | |- | ||
− | | | + | |X||[[User:Lconstab |Constable, Lorraine]] |
|colspan="2"|Constable Consulting Inc. | |colspan="2"|Constable Consulting Inc. | ||
|- | |- | ||
Line 62: | Line 63: | ||
|colspan="2"| AEGIS | |colspan="2"| AEGIS | ||
|- | |- | ||
− | | | + | |X||[[User:Ajulian | Julian, Tony]] |
|colspan="2"|Mayo Clinic | |colspan="2"|Mayo Clinic | ||
|- | |- | ||
− | | | + | |X||Knapp, Paul |
|colspan="2"| Pknapp Consulting | |colspan="2"| Pknapp Consulting | ||
|- | |- | ||
− | | | + | |X||Kubick, Wayne |
|colspan="2"|HL7 CTO | |colspan="2"|HL7 CTO | ||
|- | |- | ||
Line 74: | Line 75: | ||
|colspan="2"| ICode Solutions | |colspan="2"| ICode Solutions | ||
|- | |- | ||
− | | | + | |X||[[User:Clynchmd | Lynch, Cecil]] |
|colspan="2"|Accenture | |colspan="2"|Accenture | ||
|- | |- | ||
− | | | + | |X||Milosevic, Zoran |
|colspan="2"|Deontik Pty Ltd | |colspan="2"|Deontik Pty Ltd | ||
|- | |- | ||
− | | | + | |X||[[User:Astechishin| Stechishin,Andy]] |
− | |||
− | |||
− | |||
|colspan="2"|CANA Software and Service Ltd. | |colspan="2"|CANA Software and Service Ltd. | ||
|- | |- | ||
Line 115: | Line 113: | ||
==Minutes== | ==Minutes== | ||
+ | #Approval of Agenda and [[2016_ARB_Montreal_WGM | WGM Minutes]] | ||
+ | #*'''Motion to approve''' (Lorraine/ Paul) | ||
+ | #*'''Vote''' 7-0-0 | ||
+ | #Governance | ||
+ | #Methodology (60 minutes) | ||
+ | #*[http://gforge.hl7.org/gf/project/arbgeneral/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2FHL7%2520Project%2520Scope%2520Statement%2520v2015.1_CIMI_POC_d20160511.docx CIMI Proof of concept] | ||
+ | #**Is this a new product? Family? Where does it fit? | ||
+ | #**Lorraine: Using existing CIMI models - trying to map to Patient Care DAM, and how they would fit in the models. Providing direction on modeling, and relation across out standards. | ||
+ | #**Cecil: It is new - and it lack definition. Assume 'existing clinical requirements' : they dont say the requirements are the same. Guess they are from the V3 DAM. New ? models: If CIMI models they are a new product. | ||
+ | #**Paul: Output is models. | ||
+ | #**Wayne: Applied to any of the standards. | ||
+ | #**Lorraine: Generate FHIR profiles. | ||
+ | #**Paul: Not a different product | ||
+ | #**Lorraine: I went to the CIMI CQI project: | ||
+ | #**Cecil: How much of the EHR is ported to CIMI? | ||
+ | #**Lorraine: modeling to QICORE. Orthogonal to the rest of HL7 model. Suggest tht threads be gathered and coordinated. | ||
+ | #**Cecil: It is not new if it is a singular model, different if it crosses product families. | ||
+ | #**Paul: Not a new thing: Isnt the DAM across families? | ||
+ | #**Lorraine: Yes - one just finished ballot. | ||
+ | #**Paul: DAMS across families | ||
+ | #**Wayne: In Section 4 it appears that this would be logical models. | ||
+ | #**Andy B: There are fundamental different reference models from openehr. FHIR is a different model. The importance is the relationship to the DAMs. It is now HL7 work. What is the thread that brings the models under the HL7 Banner. It comes from a different modeling universe. FHIR is in an HL7 universe. It is a new variety of HL7 Model. The trick is to create legitimization, create Governance and consistency to bring it together. | ||
+ | #**Paul: More conceptual or concrete | ||
+ | #**Zoran: More concrete. | ||
+ | #**Paul: Can it be rendered into a family? Is it process for model, or rendering into content? How can these artifacts be rendered into families? Can we do so algorithmically? | ||
+ | #**Lorraine: Another project generating FHIR profiles - rule based, automatable | ||
+ | #**Paul: Elements mapped to FHIR models, consistency of meaning? Coming up with the models. | ||
+ | #**Lorraine: Relating models to DAMS, another project generating concrete content. Should we be involved for consistency? What is our position? | ||
+ | #**Paul: CIMI model definition or statement of ownership? | ||
+ | #**Wayne: Just a model - can be rendered in any family. | ||
+ | #**Cecil: I can render FHIR in multiple ways, but its still FHIR. Purpose to have decision support models. | ||
+ | #**Wayne: I hadnt heard of decision support. | ||
+ | #**Lorraine: They are working with CQI. Should we be involved, or let it run on its own. | ||
+ | #**Paul: Makes sense to observe - it might go off into its own space unnecessarily. | ||
+ | #**Lorraine: ARB monitor for coherence. | ||
+ | #**Wayne: Invite CIMI to a meeting. | ||
+ | #**'''Motion''' ARB be co-sponsor of the project, with periodic reports on progress what they are doing and where they are going. | ||
+ | #**Zoran: On this PSS only? Need to clarify bullet point "Demonstrate relationship between information models and logically computable expressions" | ||
+ | #**'''Motion to table''' (Paul/Lorraine) | ||
+ | #**'''Vote''' 7-0-0 | ||
+ | #** Tony will invite CIMI representatives to the next call. | ||
+ | #*SAIF super light | ||
+ | #**We are asked to prepare an explanation of the ISM, and how to use it | ||
+ | #**Lorraine: We have material, but not consumable by others? | ||
+ | #**Lorraine will dig through what we have, and find the gaps!. | ||
+ | #**Zoran: In doing so you will leverage your experience with ODL. | ||
+ | #**Zoran will help. | ||
+ | #Other business and planning | ||
+ | ##Finish Substantivity | ||
+ | ## Finish withdrawal with PIC | ||
+ | ## CIMI | ||
+ | ##* Engage with Grahame on CIMI on FHIR | ||
+ | ##* Engage Harold, Stan, or Jay on CIMI | ||
+ | ##* Evaluate CIMI architecture | ||
+ | #Adjournment | ||
[[Category:2016 Arb Minutes]] | [[Category:2016 Arb Minutes]] |
Latest revision as of 19:52, 7 June 2016
ARB - Meeting (Date in Title)
logistics
Teleconferences are held on Tuesday at 4:00pm U.S. Eastern Schedules may be found at HL7.org Conference Call Center
Please join my meeting from your computer, tablet or smartphone.
- Join the meeting:
- Join the online meeting: Online Meeting Link:https://join.freeconferencecall.com/arb97
- Online Meeting ID:arb97
- If you cant use voip then capture the PIN from the screen for the above action, then
- Dial into the conference: Dial-in Number:(605) 472-5556 - United States
- enter the access code 332183
- enter the pin.
- International Dial-in Numbers:https://www.freeconferencecall.com/wall/arb97/#international
- Weekly conference call.
- For 24/7 customer service please call (844) 844-1322.
Agenda
- Call to order
- Roll Call
- Approval of Agenda and WGM Minutes
- Governance
- Methodology (60 minutes)
- CIMI Proof of concept
- Is this a new product? Family? Where does it fit?
- SAIF super light
- We are asked to prepare an explanation of the ISM, and how to use it
- CIMI Proof of concept
- Other business and planning
- Conformance Testing for ONC
- Adjournment
Meeting Information
HL7 ArB Work Group Meeting Minutes Location: Telcon |
Date: 20160531 Time: 4:00pm U.S. Eastern | |||
Facilitator | Julian, Tony | Note taker(s) | Julian, Tony | |
Attendee | Name | Affiliation | ||
X | Bond,Andy | NEHTA | ||
X | Constable, Lorraine | Constable Consulting Inc. | ||
. | Dagnall, Bo | HP Enterprise Services | ||
. | Hufnagel, Steve | ????? | ||
. | Hyland, Mario | AEGIS | ||
X | Julian, Tony | Mayo Clinic | ||
X | Knapp, Paul | Pknapp Consulting | ||
X | Kubick, Wayne | HL7 CTO | ||
. | Loyd, Patrick | ICode Solutions | ||
X | Lynch, Cecil | Accenture | ||
X | Milosevic, Zoran | Deontik Pty Ltd | ||
X | Stechishin,Andy | CANA Software and Service Ltd. | ||
Guests | ||||
. | Nelson, Dale | Accenture | ||
. | Grow, Richard | U.S. Department of Veterans affairs | ||
. | ||||
Legend | ||||
X | Present | |||
. | Absent | |||
R | Regrets | |||
Quorum Requirements (Co-chair + 3) Met: Yes |
Minutes
- Approval of Agenda and WGM Minutes
- Motion to approve (Lorraine/ Paul)
- Vote 7-0-0
- Governance
- Methodology (60 minutes)
- CIMI Proof of concept
- Is this a new product? Family? Where does it fit?
- Lorraine: Using existing CIMI models - trying to map to Patient Care DAM, and how they would fit in the models. Providing direction on modeling, and relation across out standards.
- Cecil: It is new - and it lack definition. Assume 'existing clinical requirements' : they dont say the requirements are the same. Guess they are from the V3 DAM. New ? models: If CIMI models they are a new product.
- Paul: Output is models.
- Wayne: Applied to any of the standards.
- Lorraine: Generate FHIR profiles.
- Paul: Not a different product
- Lorraine: I went to the CIMI CQI project:
- Cecil: How much of the EHR is ported to CIMI?
- Lorraine: modeling to QICORE. Orthogonal to the rest of HL7 model. Suggest tht threads be gathered and coordinated.
- Cecil: It is not new if it is a singular model, different if it crosses product families.
- Paul: Not a new thing: Isnt the DAM across families?
- Lorraine: Yes - one just finished ballot.
- Paul: DAMS across families
- Wayne: In Section 4 it appears that this would be logical models.
- Andy B: There are fundamental different reference models from openehr. FHIR is a different model. The importance is the relationship to the DAMs. It is now HL7 work. What is the thread that brings the models under the HL7 Banner. It comes from a different modeling universe. FHIR is in an HL7 universe. It is a new variety of HL7 Model. The trick is to create legitimization, create Governance and consistency to bring it together.
- Paul: More conceptual or concrete
- Zoran: More concrete.
- Paul: Can it be rendered into a family? Is it process for model, or rendering into content? How can these artifacts be rendered into families? Can we do so algorithmically?
- Lorraine: Another project generating FHIR profiles - rule based, automatable
- Paul: Elements mapped to FHIR models, consistency of meaning? Coming up with the models.
- Lorraine: Relating models to DAMS, another project generating concrete content. Should we be involved for consistency? What is our position?
- Paul: CIMI model definition or statement of ownership?
- Wayne: Just a model - can be rendered in any family.
- Cecil: I can render FHIR in multiple ways, but its still FHIR. Purpose to have decision support models.
- Wayne: I hadnt heard of decision support.
- Lorraine: They are working with CQI. Should we be involved, or let it run on its own.
- Paul: Makes sense to observe - it might go off into its own space unnecessarily.
- Lorraine: ARB monitor for coherence.
- Wayne: Invite CIMI to a meeting.
- Motion ARB be co-sponsor of the project, with periodic reports on progress what they are doing and where they are going.
- Zoran: On this PSS only? Need to clarify bullet point "Demonstrate relationship between information models and logically computable expressions"
- Motion to table (Paul/Lorraine)
- Vote 7-0-0
- Tony will invite CIMI representatives to the next call.
- SAIF super light
- We are asked to prepare an explanation of the ISM, and how to use it
- Lorraine: We have material, but not consumable by others?
- Lorraine will dig through what we have, and find the gaps!.
- Zoran: In doing so you will leverage your experience with ODL.
- Zoran will help.
- CIMI Proof of concept
- Other business and planning
- Finish Substantivity
- Finish withdrawal with PIC
- CIMI
- Engage with Grahame on CIMI on FHIR
- Engage Harold, Stan, or Jay on CIMI
- Evaluate CIMI architecture
- Adjournment