This wiki has undergone a migration to Confluence found Here
Difference between revisions of "20160329 arb minutes"
Jump to navigation
Jump to search
m (→Agenda) |
m |
||
(6 intermediate revisions by the same user not shown) | |||
Line 15: | Line 15: | ||
--> | --> | ||
=ARB - Meeting (Date in Title)= | =ARB - Meeting (Date in Title)= | ||
− | |||
==Agenda== | ==Agenda== | ||
#Call to order | #Call to order | ||
Line 22: | Line 21: | ||
#Methodology | #Methodology | ||
##Document Location(20 Minutes) | ##Document Location(20 Minutes) | ||
− | ##Substantivity( | + | ##Substantivity(5 Minutes) |
+ | ##Modeling Skills (10 Minutes) | ||
##Clinical Ontology(20 minutes) | ##Clinical Ontology(20 minutes) | ||
#Other business and planning | #Other business and planning | ||
Line 31: | Line 31: | ||
| width="50%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 ArB Work Group Meeting Minutes''' <br/> | | width="50%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 ArB Work Group Meeting Minutes''' <br/> | ||
'''Location: [[spring_ARB_Logistics| Telcon]]''' | '''Location: [[spring_ARB_Logistics| Telcon]]''' | ||
− | | width="50%" colspan="3" align="left" style="background:#f0f0f0;"|'''Date: | + | | width="50%" colspan="3" align="left" style="background:#f0f0f0;"|'''Date: 20160329'''<br/> '''Time: 4:00pm U.S. Eastern''' |
|- | |- | ||
| width="10%" colspan="1" align="right"|'''Facilitator''' | | width="10%" colspan="1" align="right"|'''Facilitator''' | ||
− | | width="35%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] | + | | width="35%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] |
| width="10%" colspan="1" align="right"|'''Note taker(s)''' | | width="10%" colspan="1" align="right"|'''Note taker(s)''' | ||
− | | width="30%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] | + | | width="30%" colspan="1" align="left"|[[User:Ajulian | Julian, Tony]] |
|- | |- | ||
| border="4" cellpadding="1" colspan="4" style="background:#f0f0f0;"| | | border="4" cellpadding="1" colspan="4" style="background:#f0f0f0;"| | ||
Line 47: | Line 47: | ||
|colspan="2"|NEHTA | |colspan="2"|NEHTA | ||
|- | |- | ||
− | | | + | |X||[[User:Lconstab |Constable, Lorraine]] |
|colspan="2"|Constable Consulting Inc. | |colspan="2"|Constable Consulting Inc. | ||
|- | |- | ||
Line 56: | Line 56: | ||
|colspan="2"| ????? | |colspan="2"| ????? | ||
|- | |- | ||
− | | | + | |X|| Hyland, Mario |
|colspan="2"| AEGIS | |colspan="2"| AEGIS | ||
|- | |- | ||
− | | | + | |X||[[User:Ajulian | Julian, Tony]] |
|colspan="2"|Mayo Clinic | |colspan="2"|Mayo Clinic | ||
|- | |- | ||
− | | | + | |X||Knapp, Paul |
|colspan="2"| Pknapp Consulting | |colspan="2"| Pknapp Consulting | ||
|- | |- | ||
− | | | + | |X||Kubick, Wayne |
|colspan="2"|HL7 CTO | |colspan="2"|HL7 CTO | ||
|- | |- | ||
Line 74: | Line 74: | ||
|colspan="2"|Accenture | |colspan="2"|Accenture | ||
|- | |- | ||
− | | | + | |X||Milosevic, Zoran |
|colspan="2"|Deontik Pty Ltd | |colspan="2"|Deontik Pty Ltd | ||
|- | |- | ||
Line 85: | Line 85: | ||
|colspan="4" align="center"|Guests | |colspan="4" align="center"|Guests | ||
|- | |- | ||
− | | | + | |X|| Nelson, Dale |
|colspan="2"| Accenture | |colspan="2"| Accenture | ||
|- | |- | ||
− | |.|| | + | |.||Sottara, Davide |
− | |colspan="2"| | + | |colspan="2"|Mayo Clinic |
|- | |- | ||
|.|| | |.|| | ||
Line 112: | Line 112: | ||
==Minutes== | ==Minutes== | ||
− | + | #Minutes | |
− | + | ##'''Motion''' to approve (Lorraine/Zoran) | |
− | + | ##'''Vote''' 6-0-0 | |
+ | #Methodology | ||
+ | ##Health Level Seven International(HL7) Document location(s) (20 Minutes) | ||
+ | ###HL7 Projects and External Projects with no formal agreement | ||
+ | ####From the point at which material is ready for ballot all work products SHALL be maintained on HL7 managed platforms. | ||
+ | ####Work groups SHALL maintain all of their development material on HL7 managed platforms so that backup and longterm availability is maintained. | ||
+ | ####Any deviations SHALL require approval by EST. | ||
+ | ###External projects when formal agreement(s) exist between HL7 and the external organization on document location e.g. National Council for Prescription Drug Programs, (NCPDP) | ||
+ | ####Material SHALL exist at the location defined in the agreement | ||
+ | ####HL7 Participants SHALL have access to the material(s). | ||
+ | ###Work groups SHALL publish the location of their documents on their webpage (which may point to their wiki). | ||
+ | ###'''Motion''' - To endorse and present to the TSC(Lorraine/Mario) | ||
+ | ###'''Vote''' 6-0-0 | ||
+ | #Other business and planning: | ||
+ | ##Wayne and Mario volunteered to scan the Co-Chair Handbook. | ||
+ | ##Tony will add item to co-chair dinner about minutes. | ||
+ | ##Next Week: | ||
+ | ###Substantivity | ||
+ | ###Clinical Ontology | ||
[[Category:2016 Arb Minutes]] | [[Category:2016 Arb Minutes]] |
Latest revision as of 20:06, 5 April 2016
ARB - Meeting (Date in Title)
Agenda
- Call to order
- Roll Call
- Approval of Agenda and Minutes
- Methodology
- Document Location(20 Minutes)
- Substantivity(5 Minutes)
- Modeling Skills (10 Minutes)
- Clinical Ontology(20 minutes)
- Other business and planning
- Adjournment
Meeting Information
HL7 ArB Work Group Meeting Minutes Location: Telcon |
Date: 20160329 Time: 4:00pm U.S. Eastern | |||
Facilitator | Julian, Tony | Note taker(s) | Julian, Tony | |
Attendee | Name | Affiliation | ||
. | Bond,Andy | NEHTA | ||
X | Constable, Lorraine | Constable Consulting Inc. | ||
. | Dagnall, Bo | HP Enterprise Services | ||
. | Hufnagel, Steve | ????? | ||
X | Hyland, Mario | AEGIS | ||
X | Julian, Tony | Mayo Clinic | ||
X | Knapp, Paul | Pknapp Consulting | ||
X | Kubick, Wayne | HL7 CTO | ||
. | Loyd, Patrick | ICode Solutions | ||
. | Lynch, Cecil | Accenture | ||
X | Milosevic, Zoran | Deontik Pty Ltd | ||
. | Quinn, John | HL7 CTO Emeritus | ||
. | Stechishin,Andy | CANA Software and Service Ltd. | ||
Guests | ||||
X | Nelson, Dale | Accenture | ||
. | Sottara, Davide | Mayo Clinic | ||
. | ||||
Legend | ||||
X | Present | |||
. | Absent | |||
R | Regrets | |||
Quorum Requirements (Co-chair + 3) Met: Yes |
Minutes
- Minutes
- Motion to approve (Lorraine/Zoran)
- Vote 6-0-0
- Methodology
- Health Level Seven International(HL7) Document location(s) (20 Minutes)
- HL7 Projects and External Projects with no formal agreement
- From the point at which material is ready for ballot all work products SHALL be maintained on HL7 managed platforms.
- Work groups SHALL maintain all of their development material on HL7 managed platforms so that backup and longterm availability is maintained.
- Any deviations SHALL require approval by EST.
- External projects when formal agreement(s) exist between HL7 and the external organization on document location e.g. National Council for Prescription Drug Programs, (NCPDP)
- Material SHALL exist at the location defined in the agreement
- HL7 Participants SHALL have access to the material(s).
- Work groups SHALL publish the location of their documents on their webpage (which may point to their wiki).
- Motion - To endorse and present to the TSC(Lorraine/Mario)
- Vote 6-0-0
- HL7 Projects and External Projects with no formal agreement
- Health Level Seven International(HL7) Document location(s) (20 Minutes)
- Other business and planning:
- Wayne and Mario volunteered to scan the Co-Chair Handbook.
- Tony will add item to co-chair dinner about minutes.
- Next Week:
- Substantivity
- Clinical Ontology