This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20160208 FGB concall"

From HL7Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
 
|colspan="2"|Co-Chair/CTO ||colspan="6"|Members  
 
|colspan="2"|Co-Chair/CTO ||colspan="6"|Members  
 
|-
 
|-
| ||Woody Beeler||Regrets||Lorraine Constable|| ||Grahame Grieve|| ||David Hay||
+
| ||Woody Beeler||Regrets||Lorraine Constable|| x||Grahame Grieve|| ||David Hay||
 
|-
 
|-
| ||Dave Shaver ||  || Ewout Kramer|| ||Cecil Lynch (ArB) || || Lloyd McKenzie (FMG) ||
+
|x ||Dave Shaver ||  || Ewout Kramer||x ||Cecil Lynch (ArB) ||x || Lloyd McKenzie (FMG) ||
 
|-
 
|-
| ||Wayne Kubick || . ||Calvin Beebe||. ||  
+
|x ||Wayne Kubick || . ||Calvin Beebe||. ||  
 
|-
 
|-
 
|colspan="2" rowspan="3"|observers/guests
 
|colspan="2" rowspan="3"|observers/guests
 
| ||Austin Kreisler
 
| ||Austin Kreisler
 
|-
 
|-
|||Anne W., scribe
+
|x||Anne W., scribe
 
|-
 
|-
 
| ||
 
| ||
Line 32: Line 32:
 
*Roll call -  
 
*Roll call -  
 
*Agenda Review
 
*Agenda Review
*Approve minutes of [[20160201 FGB concall]]
+
*Approve minutes of [[20150201 FGB concall]]
 
*Action Item review:  
 
*Action Item review:  
 
**Anne to find out what the drop dead date is from Lillian for moving the FGB Q0 to Tuesday
 
**Anne to find out what the drop dead date is from Lillian for moving the FGB Q0 to Tuesday
Line 53: Line 53:
  
 
==Minutes==
 
==Minutes==
Convened at
+
*Convened at 4:10 pm Eastern
 
+
*Agenda review: agenda accepted
*
+
*Minutes:
 +
**MOTION to approve by Lloyd; second by Cecil
 +
**VOTE: all in favor
 +
*Anne reports there is a bit of leeway to change to Tuesday per Lillian. Agreement that we'll move FGB to Q0 on Tuesday.
 +
**ACTION: Anne to alert Lillian
 +
* TSC punted the FGB decision to a joint meeting occurring next week between ARB and SGB. Cecil: it makes sense to interview the person in the role. Grahame reached out to ARB and SGB to discuss joining the call or having a separate call beforehand to discuss Grahame's view of the role. Discussion over executive committee involvement. Cecil points out that SGB and ARB has the responsibility to execute the governance model.
 +
**ACTION: Anne to add update on the topic to next week's call
 +
*Mission and Charter and DMP:
 +
**Discussion over the bullet under work products and contributions: "Define metrics by which progress towards the objectives of the FGB and FMG can be measured and evaluated
 +
***ACTION: Add topic to upcoming agenda
 +
**MOTION by Lloyd that no changes are currently necessary to the M&C, although the product director role will be evolving. Grahame seconds.
 +
**VOTE: all in favor (3/0/0)
 +
*DMP:
 +
**Reviewed document
 +
***ACTION: Lloyd will update section 3 on meeting notifications to reflect reality (internal vs. external)
 +
***ACTION: Lloyd to add language to allow appointment of interim co-chair in section 5.2
 +
*FMG: worked on exclusion of a few warnings from build process. Working on PSSes and resource proposals. Will start talking about Connectathon tracks soon.
 +
*ACTION: Anne to add discussion on Custom Resources to next week's call
 +
*Adjourned at 4:57 pm Eastern
  
 
===Next Steps===
 
===Next Steps===
Line 65: Line 83:
 
|-
 
|-
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
*[[20150215 FGB concall]]
+
*[[20160215 FGB concall]]
  
 
|}
 
|}

Latest revision as of 20:15, 15 February 2016

HL7 TSC FGB Meeting Minutes

Location: call 770-657-9270 using code 985371#
GoToMeeting ID: 136-494-157

Date: 2015-mm-dd
Time: 4:00 PM U.S. Eastern
Facilitator: Note taker(s): Anne W.
Quorum = Chair plus 2 yes/no
Co-Chair/CTO Members
Woody Beeler Regrets Lorraine Constable x Grahame Grieve David Hay
x Dave Shaver Ewout Kramer x Cecil Lynch (ArB) x Lloyd McKenzie (FMG)
x Wayne Kubick . Calvin Beebe .
observers/guests Austin Kreisler
x Anne W., scribe

Agenda

  • Roll call -
  • Agenda Review
  • Approve minutes of 20150201 FGB concall
  • Action Item review:
    • Anne to find out what the drop dead date is from Lillian for moving the FGB Q0 to Tuesday
    • Anne to recirculate precepts document to FGB members
    • Lorraine to ask TSC for guidance on Grahame replacing CTO
    • Anne to send TSC meeting invite to Lloyd for TSC call
  • Items for Review
  • FMG update -
  • Methodology update-
  • Review precepts, associated governance points and risks
  • Next steps: Define and Resource other Governance processes.

Minutes

  • Convened at 4:10 pm Eastern
  • Agenda review: agenda accepted
  • Minutes:
    • MOTION to approve by Lloyd; second by Cecil
    • VOTE: all in favor
  • Anne reports there is a bit of leeway to change to Tuesday per Lillian. Agreement that we'll move FGB to Q0 on Tuesday.
    • ACTION: Anne to alert Lillian
  • TSC punted the FGB decision to a joint meeting occurring next week between ARB and SGB. Cecil: it makes sense to interview the person in the role. Grahame reached out to ARB and SGB to discuss joining the call or having a separate call beforehand to discuss Grahame's view of the role. Discussion over executive committee involvement. Cecil points out that SGB and ARB has the responsibility to execute the governance model.
    • ACTION: Anne to add update on the topic to next week's call
  • Mission and Charter and DMP:
    • Discussion over the bullet under work products and contributions: "Define metrics by which progress towards the objectives of the FGB and FMG can be measured and evaluated
      • ACTION: Add topic to upcoming agenda
    • MOTION by Lloyd that no changes are currently necessary to the M&C, although the product director role will be evolving. Grahame seconds.
    • VOTE: all in favor (3/0/0)
  • DMP:
    • Reviewed document
      • ACTION: Lloyd will update section 3 on meeting notifications to reflect reality (internal vs. external)
      • ACTION: Lloyd to add language to allow appointment of interim co-chair in section 5.2
  • FMG: worked on exclusion of a few warnings from build process. Working on PSSes and resource proposals. Will start talking about Connectathon tracks soon.
  • ACTION: Anne to add discussion on Custom Resources to next week's call
  • Adjourned at 4:57 pm Eastern

Next Steps

Actions (Include Owner, Action Item, and due date)
Next Meeting/Preliminary Agenda Items


Back to FHIR_Governance_Board

© 2014 Health Level Seven® International. All rights reserved.