This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "EBMonFHIR"

From HL7Wiki
Jump to navigation Jump to search
Line 18: Line 18:
  
 
==== Listserv ====
 
==== Listserv ====
 +
 
* Google group: [https://groups.google.com/forum/#!forum/ebmonfhir https://groups.google.com/forum/#!forum/ebmonfhir]
 
* Google group: [https://groups.google.com/forum/#!forum/ebmonfhir https://groups.google.com/forum/#!forum/ebmonfhir]
  
Line 27: Line 28:
  
 
==Project Documents==
 
==Project Documents==
 +
 
* Google Drive:  
 
* Google Drive:  
  
 
==Project Information==
 
==Project Information==
  
*
+
* See the [https://drive.google.com/open?id=1p263n1b4mNAlhc-LefjI19Ts-MaxIaIi Project Scope Statement]
  
 
==Status==
 
==Status==
 
The CDS, CQI, and BRR WGs and FHIR management group approved the draft PSS in May of 2018. The next step will be the connectathon in September 2018.
 
The CDS, CQI, and BRR WGs and FHIR management group approved the draft PSS in May of 2018. The next step will be the connectathon in September 2018.

Revision as of 13:02, 22 May 2018

Return to Clinical Decision Support Work Group

The Fast Healthcare Interoperability Resources (FHIR) Resources for Evidence-Based Medicine (EBM) Knowledge Assets project (EBMonFHIR) is working its way through approval as an HL7 project.

EBMonFHIR is sponsored by the Clinical Decision Support Work Group and co-sponsored by the Clinical Quality Information Work Group and Biomedical Research and Regulation Work Group.

The goal of EBMonFHIR is to provide interoperability (standards for data exchange) for those producing, analyzing, synthesizing, disseminating and implementing clinical research (evidence) and recommendations for clinical care (clinical practice guidelines).

This page will be updated soon with details about how to get involved and stay informed. In the meantime if you want to get involved and stay informed email balper@ebsco.com

Meeting Information

Call Coordinates

Listserv

Agendas

Conference Call Recordings and Repository

Project Documents

  • Google Drive:

Project Information

Status

The CDS, CQI, and BRR WGs and FHIR management group approved the draft PSS in May of 2018. The next step will be the connectathon in September 2018.