This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "DCM4MD:Use case candidates"

From HL7Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
===Use Case Candidates===
 
===Use Case Candidates===
  
''JL: It might be useful to adopt a naming convention to help define use case scope. I've found the verb-object format to work well: see suggestions in the Notes column. ''
+
Note: By convention, use case  names need to use active verbs (e.g. "Intubate patient") rather than qualified nounns (e.g. "Patient Intubation").
  
{| border="1"
+
{| border="0" bodercolor="yellow"
 
! Candidate Use Case Name !! Source !! Type !! Status !! Note
 
! Candidate Use Case Name !! Source !! Type !! Status !! Note
 
|-
 
|-
| Intubate Patient, Planned || MMosely || Business Process || VA priority 1 ||
+
| 1 ||Intubate Patient, Planned || MMosely || Business Process || VA priority 1 ||
 
|-
 
|-
| Change settings || MMosely || Business Process || VA priority 2 ||
+
| 2 ||Change settings || MMosely || Business Process || VA priority 2 ||
 
|-
 
|-
| Wean Patient || MMosely || Business Process || VA priority 2 ||
+
| 3 ||Wean Patient || MMosely || Business Process || VA priority 2 ||
 
|-
 
|-
| Additive therapy || MMosely || Business Area || VA priority 2 ||
+
| 4 ||Additive therapy || MMosely || Business Area || VA priority 2 ||
 
|-
 
|-
| Extubate Patient, Planned || MMosely || Business Process || VA priority 2 ||
+
| 5 || Extubate Patient, Planned || MMosely || Business Process || VA priority 2 ||
 
|-
 
|-
| Extubate Patient, Unplanned || MMosely || Business Process || VA priority 2 ||
+
| 6 || Extubate Patient, Unplanned || MMosely || Business Process || VA priority 2 ||
 
|-
 
|-
| Respirator-acquired pneumonia || VA conference call || Scenario ||  ||
+
| 7 ||Respirator-acquired pneumonia || VA conference call || Scenario ||  ||
 
|-
 
|-
| Glucose measurement || PC meeting at WGM, Jan 2010 || Device type || || Record blood glucose
+
| 8 || Glucose measurement || PC meeting at WGM, Jan 2010 || Device type || || Record blood glucose
 
|-
 
|-
|Blood Glucose Monitor||Example for the teleconference 7-7 2010||Device||  || Work in progress  
+
| 9 || Blood Glucose Monitor||Example for the teleconference 7-7 2010||Device||  || Work in progress  
 
|-
 
|-
| Insulin delivery by pump || PC meeting at WGM, Jan 2010 || Device type ||  ||  
+
| 10|| Insulin delivery by pump || PC meeting at WGM, Jan 2010 || Device type ||  ||  
 
|-
 
|-
| Patient Controlled Analgesia (or maybe infusion pump?) || PC meeting at WGM, Jan 2010 || Device type ||  || Configure PCA; Deliver PCA
+
| 11|| Patient Controlled Analgesia (or maybe infusion pump?) || PC meeting at WGM, Jan 2010 || Device type ||  || Configure PCA; Deliver PCA
 
|-
 
|-
| Respiratory therapy using patient ventilator || PC meeting at WGM, Jan 2010 || Device type ||  ||  
+
| 12|| Respiratory therapy using patient ventilator || PC meeting at WGM, Jan 2010 || Device type ||  ||  
 
|-
 
|-
| Patient registered at hospital || Ruth Berge (IHE Patient Care Device group) || Business Process  || || Register patient
+
| 13|| Patient registered at hospital || Ruth Berge (IHE Patient Care Device group) || Business Process  || || Register patient
 
|-
 
|-
| Patient admitted to ICU || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Admit patient to ICU
+
| 14|| Patient admitted to ICU || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Admit patient to ICU
 
|-
 
|-
| Nurse initiates bedside flowsheet in ICU, confirms patient location || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Configure measurement
+
| 13|| Nurse initiates bedside flowsheet in ICU, confirms patient location || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Configure measurement
 
|-
 
|-
| Nurse ‘admits’ patient to monitor (& ventilator) || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Connect patient
+
| 14|| Nurse ‘admits’ patient to monitor (& ventilator) || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Connect patient
 
|-
 
|-
| Monitor & vent data flow to flowsheet || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Record measurement; Trigger alarm . . .
+
| 15|| Monitor & vent data flow to flowsheet || Ruth Berge (IHE Patient Care Device group) || Business Process ||  || Record measurement; Trigger alarm . . .
 
|-
 
|-
| Stop PCA Infusion (when respiration monitor indicates a problem) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 16||Stop PCA Infusion (when respiration monitor indicates a problem) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Abort Ventilator Imaging Pause (when imaging complete or time limit exceeded) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 17|| Abort Ventilator Imaging Pause (when imaging complete or time limit exceeded) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Identify Need to Adjust Infusion Dosage (when tests indicate concentrations are incorrect) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 18|| Identify Need to Adjust Infusion Dosage (when tests indicate concentrations are incorrect) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Restart Ventilator (when CPB machine is removed) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 19|| Restart Ventilator (when CPB machine is removed) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Adjust Infusion Dosage (when tests indicate concentrations are incorrect  || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 20|| Adjust Infusion Dosage (when tests indicate concentrations are incorrect  || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Alert Rapid Response Team (when vital signs indicate) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 21|| Alert Rapid Response Team (when vital signs indicate) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Confirm device configuration (when device is connected) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
+
| 22|| Confirm device configuration (when device is connected) || ASTM ICE Group (named by JLyle) || Business Process ||  ||  
 
|-
 
|-
| Apgar Score  || HL7 Patient Care DCM documentation  || Observation ||  || Record apgar score. Preparing for ballot in January 2011
+
| 23|| Apgar Score  || HL7 Patient Care DCM documentation  || Observation ||  || Record apgar score. Preparing for ballot in January 2011
 
|-
 
|-
| Barthel Index  || HL7 Patient Care DCM documentation  || Observation ||  || Preparing for ballot in January 2011
+
| 24|| Barthel Index  || HL7 Patient Care DCM documentation  || Observation ||  || Preparing for ballot in January 2011
 
|-
 
|-
| Blood Pressure  || HL7 Patient Care DCM documentation  || Observation ||  || Preparing for ballot in January 2011
+
| 25|| Blood Pressure  || HL7 Patient Care DCM documentation  || Observation ||  || Preparing for ballot in January 2011
 
|-
 
|-
| Body Height  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
+
| 26|| Body Height  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
 
|-
 
|-
| Body Temperature  || HL7 Patient Care DCM documentation  || Observation || ||  Preparing for ballot in January 2011
+
| 27|| Body Temperature  || HL7 Patient Care DCM documentation  || Observation || ||  Preparing for ballot in January 2011
 
|-
 
|-
| Body Weight  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
+
| 28|| Body Weight  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
 
|-
 
|-
| Braden Scale  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
+
| 29|| Braden Scale  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
 
|-
 
|-
| Glasgow Coma Scale  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
+
| 30|| Glasgow Coma Scale  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.
 
|-
 
|-
| Heart Rate  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.  
+
| 31|| Heart Rate  || HL7 Patient Care DCM documentation  || Observation ||  || Will be in ballot in september 2010. The material is almost ready.  
 
|-
 
|-
| Respiration  || HL7 Patient Care DCM documentation  || Observation ||  || Preparing for ballot in January 2011
+
| 32|| Respiration  || HL7 Patient Care DCM documentation  || Observation ||  || Preparing for ballot in January 2011
 
|-
 
|-
| Configure device settings || VA survey recommendations (DDuLong) || Business Process  || ||  
+
| 33|| Configure device settings || VA survey recommendations (DDuLong) || Business Process  || ||  
 
|-
 
|-
| Patient's response || VA survey recommendations (DDuLong) || Unk ||  ||  
+
| 34|| Patient's response || VA survey recommendations (DDuLong) || Unk ||  ||  
 
|-
 
|-
| Verify placement || VA survey recommendations (DDuLong) || Business Process ||  ||  
+
| 35|| Verify placement || VA survey recommendations (DDuLong) || Business Process ||  ||  
 
|-
 
|-
| Secretions  || VA survey recommendations (DDuLong) || Unk ||  ||  
+
| 36|| Secretions  || VA survey recommendations (DDuLong) || Unk ||  ||  
 
|-
 
|-
| ET tube  || VA survey recommendations (DDuLong) || Unk ||  ||  
+
| 37|| ET tube  || VA survey recommendations (DDuLong) || Unk ||  ||  
 
|-
 
|-
| Connect Patient || ICE decomposition (JLyle) || Business Process ||  ||  
+
| 38|| Connect Patient || ICE decomposition (JLyle) || Business Process ||  ||  
 
|-
 
|-
| Disconnect Patient || ICE decomposition (JLyle) || Business Process  || ||  
+
| 39|| Disconnect Patient || ICE decomposition (JLyle) || Business Process  || ||  
 
|-
 
|-
| Confirm configuration || ICE decomposition (JLyle) || Business Process || ||   
+
| 40|| Confirm configuration || ICE decomposition (JLyle) || Business Process || ||   
 
|-
 
|-
| Schedule action || ICE decomposition (JLyle) || Business Process ||  ||  
+
| 41|| Schedule action || ICE decomposition (JLyle) || Business Process ||  ||  
 
|-
 
|-
| Record observation || ICE decomposition (JLyle) || Business Process ||  ||  
+
| 42|| Record observation || ICE decomposition (JLyle) || Business Process ||  ||  
 
|-
 
|-
| Tracking and tracing || action item suggestions || Business area ||  ||  
+
| 43|| Tracking and tracing || action item suggestions || Business area ||  ||  
 
|-
 
|-
| Incident reporting || action item suggestions || Business area ||  ||  
+
| 44|| Incident reporting || action item suggestions || Business area ||  ||  
 
|-
 
|-
| Regulatory purposes || action item suggestions || Business area ||  ||  
+
| 45|| Regulatory purposes || action item suggestions || Business area ||  ||  
 
|-
 
|-
| Safety/Quality of Portable X-Rays || CHoang || Business Area ||  || (PnP is doing this..so we would not want to duplicate but could maybe use what they have to help with more details?)  
+
| 46|| Safety/Quality of Portable X-Rays || CHoang || Business Area ||  || (PnP is doing this..so we would not want to duplicate but could maybe use what they have to help with more details?)  
 
|-
 
|-
| Pt controlled analgesia  || CHoang || Device ||  || (PnP is doing this...same as above)
+
| 47|| Pt controlled analgesia  || CHoang || Device ||  || (PnP is doing this...same as above)
 
|-
 
|-
| Vital signs (BP/temp/pulse/pulse ox)  || CHoang || Observation ||  || (Are there any use cases already out there?)BP, temp, pulse are in this tbale above. See there. We have a DCM Oxygen saturation in Dutch.
+
| 48|| Vital signs (BP/temp/pulse/pulse ox)  || CHoang || Observation ||  || (Are there any use cases already out there?)BP, temp, pulse are in this tbale above. See there. We have a DCM Oxygen saturation in Dutch.
 
|-
 
|-
| Infusion Pumps info feeding into the EHR  || CHoang || Device ||  ||  
+
| 49|| Infusion Pumps info feeding into the EHR  || CHoang || Device ||  ||  
 
|-
 
|-
| OR of the Future Program  || CHoang || Business Area ||  || (This is already ongoing. How can we use this information to take it to another level?)
+
| 50|| OR of the Future Program  || CHoang || Business Area ||  || (This is already ongoing. How can we use this information to take it to another level?)
 
|-
 
|-
| ICE Ecosystem  || CHoang || Business Area ||  || (This is work that is happening now. ASTM F2761 Integrated Clinical Environment, or ICE)
+
| 51|| ICE Ecosystem  || CHoang || Business Area ||  || (This is work that is happening now. ASTM F2761 Integrated Clinical Environment, or ICE)
 
|-
 
|-
| ICU (ventilator, pacemaker, etc..) || CHoang || Business Area  || ||  
+
| 52|| ICU (ventilator, pacemaker, etc..) || CHoang || Business Area  || ||  
 
|-
 
|-
| Anesthesia medical devices || CHoang || Device ||  ||  
+
| 53|| Anesthesia medical devices || CHoang || Device ||  ||  
 
|-
 
|-
| Tube feedings || CHoang || Business Process||  ||  
+
| 54|| Tube feedings || CHoang || Business Process||  ||  
 
|-
 
|-
| Cardiac Stress Test || CHoang || Business Process ||  ||   
+
| 55|| Cardiac Stress Test || CHoang || Business Process ||  ||   
 
|-
 
|-
| ECHO/EKG || CHoang || Observation ||  ||  
+
| 56|| ECHO/EKG || CHoang || Observation ||  ||  
 
|-
 
|-
| Ultrasound imaging || CHoang || Observation ||  ||  
+
| 57|| Ultrasound imaging || CHoang || Observation ||  ||  
 
|-
 
|-
| Blood Glucose Monitoring || CHoang || Observation ||  ||  
+
| 58|| Blood Glucose Monitoring || CHoang || Observation ||  ||  
 
|-
 
|-
| Integrated Medication Manager (???) || CHoang || Program ||  ||  
+
| 59|| Integrated Medication Manager (???) || CHoang || Program ||  ||  
 
|-
 
|-
| CDS algorithms  || CHoang || Business Area  || || (complete systems solutions that meets regulatory, safety and clinical requirements)
+
| 60|| CDS algorithms  || CHoang || Business Area  || || (complete systems solutions that meets regulatory, safety and clinical requirements)
 
|}
 
|}

Revision as of 19:00, 7 July 2010

Back to Detailed Clinical Models for Medical Devices

Use Case Candidates

Note: By convention, use case  names need to use active verbs (e.g. "Intubate patient") rather than qualified nounns (e.g. "Patient Intubation").
Candidate Use Case Name Source Type Status Note
1 Intubate Patient, Planned MMosely Business Process VA priority 1
2 Change settings MMosely Business Process VA priority 2
3 Wean Patient MMosely Business Process VA priority 2
4 Additive therapy MMosely Business Area VA priority 2
5 Extubate Patient, Planned MMosely Business Process VA priority 2
6 Extubate Patient, Unplanned MMosely Business Process VA priority 2
7 Respirator-acquired pneumonia VA conference call Scenario
8 Glucose measurement PC meeting at WGM, Jan 2010 Device type Record blood glucose
9 Blood Glucose Monitor Example for the teleconference 7-7 2010 Device Work in progress
10 Insulin delivery by pump PC meeting at WGM, Jan 2010 Device type
11 Patient Controlled Analgesia (or maybe infusion pump?) PC meeting at WGM, Jan 2010 Device type Configure PCA; Deliver PCA
12 Respiratory therapy using patient ventilator PC meeting at WGM, Jan 2010 Device type
13 Patient registered at hospital Ruth Berge (IHE Patient Care Device group) Business Process Register patient
14 Patient admitted to ICU Ruth Berge (IHE Patient Care Device group) Business Process Admit patient to ICU
13 Nurse initiates bedside flowsheet in ICU, confirms patient location Ruth Berge (IHE Patient Care Device group) Business Process Configure measurement
14 Nurse ‘admits’ patient to monitor (& ventilator) Ruth Berge (IHE Patient Care Device group) Business Process Connect patient
15 Monitor & vent data flow to flowsheet Ruth Berge (IHE Patient Care Device group) Business Process Record measurement; Trigger alarm . . .
16 Stop PCA Infusion (when respiration monitor indicates a problem) ASTM ICE Group (named by JLyle) Business Process
17 Abort Ventilator Imaging Pause (when imaging complete or time limit exceeded) ASTM ICE Group (named by JLyle) Business Process
18 Identify Need to Adjust Infusion Dosage (when tests indicate concentrations are incorrect) ASTM ICE Group (named by JLyle) Business Process
19 Restart Ventilator (when CPB machine is removed) ASTM ICE Group (named by JLyle) Business Process
20 Adjust Infusion Dosage (when tests indicate concentrations are incorrect ASTM ICE Group (named by JLyle) Business Process
21 Alert Rapid Response Team (when vital signs indicate) ASTM ICE Group (named by JLyle) Business Process
22 Confirm device configuration (when device is connected) ASTM ICE Group (named by JLyle) Business Process
23 Apgar Score HL7 Patient Care DCM documentation Observation Record apgar score. Preparing for ballot in January 2011
24 Barthel Index HL7 Patient Care DCM documentation Observation Preparing for ballot in January 2011
25 Blood Pressure HL7 Patient Care DCM documentation Observation Preparing for ballot in January 2011
26 Body Height HL7 Patient Care DCM documentation Observation Will be in ballot in september 2010. The material is almost ready.
27 Body Temperature HL7 Patient Care DCM documentation Observation Preparing for ballot in January 2011
28 Body Weight HL7 Patient Care DCM documentation Observation Will be in ballot in september 2010. The material is almost ready.
29 Braden Scale HL7 Patient Care DCM documentation Observation Will be in ballot in september 2010. The material is almost ready.
30 Glasgow Coma Scale HL7 Patient Care DCM documentation Observation Will be in ballot in september 2010. The material is almost ready.
31 Heart Rate HL7 Patient Care DCM documentation Observation Will be in ballot in september 2010. The material is almost ready.
32 Respiration HL7 Patient Care DCM documentation Observation Preparing for ballot in January 2011
33 Configure device settings VA survey recommendations (DDuLong) Business Process
34 Patient's response VA survey recommendations (DDuLong) Unk
35 Verify placement VA survey recommendations (DDuLong) Business Process
36 Secretions VA survey recommendations (DDuLong) Unk
37 ET tube VA survey recommendations (DDuLong) Unk
38 Connect Patient ICE decomposition (JLyle) Business Process
39 Disconnect Patient ICE decomposition (JLyle) Business Process
40 Confirm configuration ICE decomposition (JLyle) Business Process
41 Schedule action ICE decomposition (JLyle) Business Process
42 Record observation ICE decomposition (JLyle) Business Process
43 Tracking and tracing action item suggestions Business area
44 Incident reporting action item suggestions Business area
45 Regulatory purposes action item suggestions Business area
46 Safety/Quality of Portable X-Rays CHoang Business Area (PnP is doing this..so we would not want to duplicate but could maybe use what they have to help with more details?)
47 Pt controlled analgesia CHoang Device (PnP is doing this...same as above)
48 Vital signs (BP/temp/pulse/pulse ox) CHoang Observation (Are there any use cases already out there?)BP, temp, pulse are in this tbale above. See there. We have a DCM Oxygen saturation in Dutch.
49 Infusion Pumps info feeding into the EHR CHoang Device
50 OR of the Future Program CHoang Business Area (This is already ongoing. How can we use this information to take it to another level?)
51 ICE Ecosystem CHoang Business Area (This is work that is happening now. ASTM F2761 Integrated Clinical Environment, or ICE)
52 ICU (ventilator, pacemaker, etc..) CHoang Business Area
53 Anesthesia medical devices CHoang Device
54 Tube feedings CHoang Business Process
55 Cardiac Stress Test CHoang Business Process
56 ECHO/EKG CHoang Observation
57 Ultrasound imaging CHoang Observation
58 Blood Glucose Monitoring CHoang Observation
59 Integrated Medication Manager (???) CHoang Program
60 CDS algorithms CHoang Business Area (complete systems solutions that meets regulatory, safety and clinical requirements)