This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20130710 FMG concall"

From HL7Wiki
Jump to navigation Jump to search
 
(4 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
|-
 
|-
 
| width="0%" colspan="2" align="right"|'''Chair''': Lloyd
 
| width="0%" colspan="2" align="right"|'''Chair''': Lloyd
| width="0%" colspan="1" align="right"|'''Note taker(s)''':   
+
| width="0%" colspan="1" align="right"|'''Note taker(s)''':  Dave Hamill
 
|}
 
|}
  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
|colspan="3" align="center" style="background:#f0f0f0;"| Quorum = chair + 4
 
|colspan="3" align="center" style="background:#f0f0f0;"| Quorum = chair + 4
|colspan="4" align="center" style="background:#f0f0f0;"| '''yes/no'''
+
|colspan="4" align="center" style="background:#f0f0f0;"| '''NO'''
 
|-
 
|-
 
| Co chairs||regrets ||Hugh Glover|| ||Lloyd McKenzie
 
| Co chairs||regrets ||Hugh Glover|| ||Lloyd McKenzie
Line 20: Line 20:
 
| colspan="2"| Members ||colspan="2"|Members ||colspan="2"|Observers/Guests
 
| colspan="2"| Members ||colspan="2"|Members ||colspan="2"|Observers/Guests
 
|-
 
|-
| ||Lorraine Constable || ||John Moehrke ||regrets ||Lynn Laakso, scribe
+
|X||Lorraine Constable ||X||John Moehrke ||regrets ||Lynn Laakso, scribe
 
|-
 
|-
 
| ||Jean Duteau  || ||Brian Pech  || || Austin Kreisler  
 
| ||Jean Duteau  || ||Brian Pech  || || Austin Kreisler  
 
|-
 
|-
| ||David Hay||||  || ||  
+
|X||David Hay||||  ||X|| Dave Hamill
 
|-
 
|-
 
| . || ||||  ||  ||  
 
| . || ||||  ||  ||  
Line 39: Line 39:
 
*Reports
 
*Reports
 
**Connectathon management (David/Brian)
 
**Connectathon management (David/Brian)
**[[FHIR Governance Board|FGB]]
+
**[[FHIR Governance Board|FGB]]  
 +
***FGB passed a motion:
 +
***:Where a resource cannot be evolved and its definition developed between WGMs and the sponsoring WG cannot make progress, then the FMG can determine the resource responsibility must be assigned to the Core Team. That assignment can be appealed to the FGB for consideration.
 +
***[http://gforge.hl7.org/gf/download/docmanfileversion/7321/10412/VitalityAssessment101March2013.pptx Vitality Assessment model] - coming up with metrics
 
**MnM –  
 
**MnM –  
 
**[[FMG Liaisons]] –
 
**[[FMG Liaisons]] –
Line 45: Line 48:
 
**Ballot Planning
 
**Ballot Planning
 
***[[:Category:FHIR_Resource_Proposal|FHIR resource proposals]] writeup status and review status  
 
***[[:Category:FHIR_Resource_Proposal|FHIR resource proposals]] writeup status and review status  
 +
***Ballot readiness and QA call scheduling
 +
***Scope boundaries discussion continued
 
**Ballot content review and QA process [[FHIR QA Guidelines]]
 
**Ballot content review and QA process [[FHIR QA Guidelines]]
 
*AOB (Any Other Business)
 
*AOB (Any Other Business)
  
 
==Minutes==
 
==Minutes==
 
+
*David Hay motioned to adjourn based on the fact that quorum was not met.
 +
*Both Lorraine and John 2nded.  Meeting adjourned
  
 
===Next Steps===
 
===Next Steps===

Latest revision as of 17:14, 10 July 2013

HL7 TSC FMG Meeting Minutes

Location: call 770-657-9270 using code 985371#
https://global.gotomeeting.com/join/450662277

Date: 2013-07-10
Time: 1:00 PM U.S. Eastern
Chair: Lloyd Note taker(s): Dave Hamill
Quorum = chair + 4 NO
Co chairs regrets Hugh Glover Lloyd McKenzie
ex-officio Ron Parker, FGB Chair . John Quinn, CTO
Members Members Observers/Guests
X Lorraine Constable X John Moehrke regrets Lynn Laakso, scribe
Jean Duteau Brian Pech Austin Kreisler
X David Hay X Dave Hamill
.

Agenda

  • Roll Call
  • Agenda Check
  • Minutes from 20130703_FMG_concall , 20130626 FMG concall
  • Administrative
    • Action items
      • FMG normalized concept in T3SD vs FTSD and a narrative definition clarifying scope vs. other WGs.
  • Reports
    • Connectathon management (David/Brian)
    • FGB
      • FGB passed a motion:
        Where a resource cannot be evolved and its definition developed between WGMs and the sponsoring WG cannot make progress, then the FMG can determine the resource responsibility must be assigned to the Core Team. That assignment can be appealed to the FGB for consideration.
      • Vitality Assessment model - coming up with metrics
    • MnM –
    • FMG Liaisons
  • Process management
    • Ballot Planning
      • FHIR resource proposals writeup status and review status
      • Ballot readiness and QA call scheduling
      • Scope boundaries discussion continued
    • Ballot content review and QA process FHIR QA Guidelines
  • AOB (Any Other Business)

Minutes

  • David Hay motioned to adjourn based on the fact that quorum was not met.
  • Both Lorraine and John 2nded. Meeting adjourned

Next Steps

Actions (Include Owner, Action Item, and due date)
Next Meeting/Preliminary Agenda Items

20130717 FMG concall


Back to FHIR_Management_Group

© 2013 Health Level Seven® International