Difference between revisions of "RPS Meeting Notes 02092010"

From HL7Wiki
Jump to navigation Jump to search
Line 45: Line 45:
  
 
Bob will be working on a high-level project plan posted by Friday, February 12, 2010.  Group needs assistance with the files necessary to extract the schema for use.  Jason will assist the group via email.
 
Bob will be working on a high-level project plan posted by Friday, February 12, 2010.  Group needs assistance with the files necessary to extract the schema for use.  Jason will assist the group via email.
 +
 +
Change/Version control should be maintained after posting of the DSTU so that the schema can evolve will testing takes place.
 +
 +
Jason and Karin will discuss offline on the Context of Use change and its effect in Medical Device submissions.
 +
 +
=====RPS R3 Project Plan====
 +
 +
Geoff reviewed the project plan that was distributed on the Listserve.  Overview of the document comments; the objective of the document is to address the description of the plans and how those plans may be achieved. 
 +
 +
There are several items that are still incomplete, please provide your comments as they will be fully populated in future versions.
 +
 +
Project Scope Statement was approved by the Technical Steering Committee - Woody Beeler (MnM) has asked to be contacted on the "hyperlinking" issue that is listed in the scope statement.  Ed Tripp will forward specific contact information to Geoff Williams.
 +
 +
Success Criteria section still needs work, if there are specific items that need to be added, please sent comments.
 +
 +
Deliverables - should there be a plan for validation (e.g., in the way of RASH); Need to add the proposed RASH project as a project dependency and need to provide a high-level description about what interactions need to take place during the RPS R3 project.
 +
 +
Bron Kisler should be approached as the Vocabulary Facilitator.
 +
 +
Comment are welcome and should be sent to Geoff Williams.

Revision as of 13:55, 9 February 2010

Return to RCRIM main page | Regulated Product Submissions


Date: February 9, 2010

Time: 7:30 AM EST – 8:30 AM EST

HL7 Telecon: 770-657-9270 Participant Passcode: 745896

Webinar: https://www.livemeeting.com/cc/pfizer/join Meeting ID: 4F2SWM Entry Code: RPS2010

Meeting Agenda

RPS R2 - Feedback on the RPS R2 Ballot Reconciliation - Jason Rock - Update on the DSTU testing - Bob Birmingham

RPS R3 - Walkthrough the draft Project Plan v0.2 document - Geoff Williams


Meeting Notes

RPS R2 Ballot Reconciliation

Jason presented the ballot reconciliation status - See presentation - TBD

Would like to have all of the comments resolved by April 2010 to resolve the negative ballots. There is still an outstanding issues with posting the DSTU -- is this going to put through the process to have it approved by the TSC for posting to the DSTU site (http://www.hl7.org/dstucomments/).

Jason will work with a small group and review the mass of the comments before presenting them back to the project status group.

RPS R2 Update on DSTU Testing

The project will continue with the DSTU testing while the DSTU comments are addressed and posted to the DSTU Site so that the Implementation group

First meeting will take place on Tuesday, February 16, 2010 at 4:00 - 5:00 PM EST; this was not intended to exclude any participants, but be convenient

  • Identify lifecycle sequences and test cases
  • Establish tools - to work with the vendor community - to establish a framework for environment
  • Establish a controlled vocabularies and sample values
  • Work on skeleton of an Implementation Guide

Bob will be working on a high-level project plan posted by Friday, February 12, 2010. Group needs assistance with the files necessary to extract the schema for use. Jason will assist the group via email.

Change/Version control should be maintained after posting of the DSTU so that the schema can evolve will testing takes place.

Jason and Karin will discuss offline on the Context of Use change and its effect in Medical Device submissions.

=RPS R3 Project Plan

Geoff reviewed the project plan that was distributed on the Listserve. Overview of the document comments; the objective of the document is to address the description of the plans and how those plans may be achieved.

There are several items that are still incomplete, please provide your comments as they will be fully populated in future versions.

Project Scope Statement was approved by the Technical Steering Committee - Woody Beeler (MnM) has asked to be contacted on the "hyperlinking" issue that is listed in the scope statement. Ed Tripp will forward specific contact information to Geoff Williams.

Success Criteria section still needs work, if there are specific items that need to be added, please sent comments.

Deliverables - should there be a plan for validation (e.g., in the way of RASH); Need to add the proposed RASH project as a project dependency and need to provide a high-level description about what interactions need to take place during the RPS R3 project.

Bron Kisler should be approached as the Vocabulary Facilitator.

Comment are welcome and should be sent to Geoff Williams.