This wiki has undergone a migration to Confluence found Here
Difference between revisions of "ITS ConCall Agenda"
Jump to navigation
Jump to search
Astechishin (talk | contribs) (→Agenda) |
Astechishin (talk | contribs) |
||
Line 3: | Line 3: | ||
==Schedule== | ==Schedule== | ||
− | Tuesday, | + | Tuesday, February 7, 2012 -- 4:00 PM Eastern Standard Time |
==Logistics== | ==Logistics== | ||
Line 14: | Line 14: | ||
==Agenda== | ==Agenda== | ||
#Role call and agenda | #Role call and agenda | ||
− | #Approve Minutes of previous meeting [[ITS Concall Minutes 20110823|August 23]] | + | #Approve Minutes of previous meeting [[ITS Concall Minutes 20110823|August 23]], [[ITS Concall Minutes 20111213|December 13]] and [[ITS Concall Minutes 20120131|January 31]] |
− | |||
#Action Item Update | #Action Item Update | ||
#*Datatypes 1.1: reconciliation package is posted | #*Datatypes 1.1: reconciliation package is posted | ||
+ | #**Last action: Withdrawal of negatives has been requested from the appropriate balloters - January 31, 2012 | ||
#*Structures and Guides 1.1 | #*Structures and Guides 1.1 | ||
− | #**Last action: | + | #**Last action: Structures has been reconciled and requested withdrawals - January 31, 2012 |
+ | #**Last action: Guides is informative and PK will investigate next action - January 31, 2012 | ||
#*Web Services | #*Web Services | ||
#**Last action: Vassil Peytchev has not reported if he can assist with Web Services | #**Last action: Vassil Peytchev has not reported if he can assist with Web Services | ||
#*InM Abstract Transports | #*InM Abstract Transports | ||
− | #**Last action: dependant on Wrappers, will park until January. If Wrappers produces, will pick up again. If Wrappers is much longer/larger or stalled, the portion of the Abstract will be sectioned off. | + | #**Last action: dependant on Wrappers, will park until January. If Wrappers produces, will pick up again. If Wrappers is much longer/larger or stalled, the portion of the Abstract will be sectioned off. Separate calls will scheduled to move this forward |
#*R2B schemas | #*R2B schemas | ||
+ | #**Last action: PK met with principles and they believe this can be moved forward. | ||
#*Wiki page update: | #*Wiki page update: | ||
#**Last action: AS reported Yunwei Wang will assist | #**Last action: AS reported Yunwei Wang will assist | ||
− | # | + | #Recirculation Ballots |
+ | #*Determine if recirculation ballots are necessary for: | ||
+ | #*# | ||
#Review of Product Briefs | #Review of Product Briefs | ||
#Next Meeting | #Next Meeting | ||
#Adjourn | #Adjourn |
Revision as of 22:11, 31 January 2012
Schedule
Tuesday, February 7, 2012 -- 4:00 PM Eastern Standard Time
Logistics
ITS Conference Call -
Conference Call: HL7 Conference Call Service:
- Phone: 770-657-9270
- Passcode: 0432811
Agenda
- Role call and agenda
- Approve Minutes of previous meeting August 23, December 13 and January 31
- Action Item Update
- Datatypes 1.1: reconciliation package is posted
- Last action: Withdrawal of negatives has been requested from the appropriate balloters - January 31, 2012
- Structures and Guides 1.1
- Last action: Structures has been reconciled and requested withdrawals - January 31, 2012
- Last action: Guides is informative and PK will investigate next action - January 31, 2012
- Web Services
- Last action: Vassil Peytchev has not reported if he can assist with Web Services
- InM Abstract Transports
- Last action: dependant on Wrappers, will park until January. If Wrappers produces, will pick up again. If Wrappers is much longer/larger or stalled, the portion of the Abstract will be sectioned off. Separate calls will scheduled to move this forward
- R2B schemas
- Last action: PK met with principles and they believe this can be moved forward.
- Wiki page update:
- Last action: AS reported Yunwei Wang will assist
- Datatypes 1.1: reconciliation package is posted
- Recirculation Ballots
- Determine if recirculation ballots are necessary for:
- Determine if recirculation ballots are necessary for:
- Review of Product Briefs
- Next Meeting
- Adjourn