This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

20130508 SAIF AP Meeting

From HL7Wiki
Jump to navigation Jump to search

HL7 SAIF Architecture Program – 2013-05-08 Meeting

Return to SAIF Architecture Program Wiki Home Page<br\> Return to SAIF AP Meeting Minutes and Agendas


Meeting Logistics

  • Dates: Wednesday Q4 of the Working Group Meeting in Atlanta 2
  • Time: 15:30 - 17:00 Eastern Time

Q4 Agenda for SAIF Architecture Program

  1. Role Call
  2. Agenda Review
  3. Brief (1-2 minutes) SAIF AP Project Status Updates (progress made and next steps)
    1. Pjt 807 - Preparation of SAIF Book for Informative Ballot (ArB)
    2. Pjt 763 - SAIF Implementation Guide and SAIF Artifact Definition (MnM)
    3. Pjt 764 - SAIF Pilot Coordination Project (Pjt Services)
    4. Pjt 226 - Risk Assessment Framework Cookbook (Security)
    5. Pjt 477 - CDA R3 (Struc Docs)
    6. Pjt 38 - Composite Order (OO)
    7. Pjt 587 - Lab Order Template (OO)
    8. Pjt 619 - HL7 Transmission Wrappers R1.1 Batch Messaging (InM)
    9. Pjt 688 - EHR System Function and Information Model (EHR-S FIM) (EHR)
    10. Pjt 551 - EHR System Functional Model Release 2.0 (ISO Project) (EHR)
    11. Pjt 863 - Cross-Paradigm Interoperability Implementation Guide for Immunizations project (“X Paradigm”) (SOA)
  4. Coordination between Lab Order and the X-Paradigm project (30 min)
  5. Review the project: Pilot SAIF ECCF-ISM Project Insight Searchable Database Entry
  1. Call schedule for the upcoming trimester
  2. Next WGM Needs

Meeting Attendees

X=Present on Call

Facilitator Austin Kreisler Note taker(s) David Hamill
Attendee Name Affiliation
X Austin Kreisler TSC Chair
X David Hamill HL7 HQ / Program Manager
X Ron Parker ArB
X John Quinn HL7 CTO
X Lorraine Constable Composite Order Pjt / OO Behavioral Framework Pjt
Patrick Loyd OO Work Group / Composite Order Pjt
X Rick Haddorff Project Services WG / SAIF Pilot Coordination Pjt
X Ken Lord
X Bo Dagnall ArB
X Zoran Milosevic HL7 Australia
X Stefano Lotti HL7 Italy
X Alean Kirnak Cross Paradigm Project
X Abdul Malik Shakir MnM
X Woody Beeler MnM WG
X Vince McCauley SOA
Quorum Requirements Met: Yes

Minutes

SAIF AP Project Status Updates

Prep of SAIF Book for Informative Ballot

  • SAIF CD - In the final stages of completing it and getting it ready for DSTU ballot


SAIF Implementation Guide and SAIF Artifact Definition (MnM)

  • Not much progress on the SAIF Artifact Definition.
  • Completed assessment of what state each is in.
  • Have assigned owners to each artifiact
  • MnM meeting Thursday Q2


SAIF Pilot Coordination Project

  • OO will be ready to meet with Rick in June to discuss Lessons Learned from Lab Order


Risk Assessment Framework Cookbook

  • John Moehrke would like to get more Work Groups using this


CDA R3

  • Reviewing ballot comments.
  • They may need to get involved in the Product Family/Product Line project.
  • Next Steps: Preparing to submit it for either the Sept 2013 or January 2014 ballot
  • Began working on Requirements Traceability


Composite Order

  • No activity this cycle


Lab Order

  • Lorraine presented the Lab Order Conceptual Specification on the Wiki and focused on the Conceptual Roles page
  • Some work has been done this past trimester. FHIR has taken most of the resource time.
  • Began working on Requirements Traceability
  • Next step: Drive down to the logical level and work on the Lab Order RMIMs


Transmission Wrappers R1.1 Batch Messaging

  • On Hold until OO brings forward the requirements


Coordination between Lab Order and X-Paradigm projects

  • Alean displayed a presentation and introduced Ken Lord
  • The discussion focused on the slide titled Use Case I: Cross Paradigm Immunization
  • The source is a public OMG data source.
  • Woody: Asked why OMG’s Reference Model was used instead of HL7’s RIM
  • Austin: The last status was that they completed a ballot 7 months ago.
  • Alean indicated that they reconciled those ballot comment.
  • Austin: Seems like the project may be veering off the original scope of the project if they are ready to implement. Alean indicated they are not ready to implement yet; they are still on course for the original project tasks.
  • When are they going to ballot next?
  • SOA isn’t sure, however when they do they may need to create an new project or modify the existing project scope statement

Review the project: Pilot SAIF ECCF-ISM Project Insight Searchable Database Entry

  • Austin reviewed the scope statement and indicated the changes made to it from the various reviews by the cosponsoring work groups.


Upcoming Call/Meeting Schedule

  • Continue with Tuesdays at noon, when needed
  • Schedule Wed Q4 in Cambridge


Adjourned 17:00 PM Eastern Time

New Action Items

Rick/Lorraine - Schedule the lessons learned meeting before the May 2013 WGM is over
Austin/Dave - Invite John Moehrke to a SAIF AP call to brainstorm on getting awareness of the Security Cookbook
Alean - Provide Austin a list of machine processable artifacts that they produced
Dave - Reserve time in Cambridge